1-1S E C T I O N O N EInstalling the SystemThis section covers unpacking, inspection, and installation of your system.System description and vocabulary illustrations are also included. Youshould read through this entire section to familiarize yourself with yourinstrument.Section Contents• Unpacking and Inspection................ 1-1• System Description .......................... 1-2• Reattaching the Scanning Head ...... 1-5• System Connections ........................ 1-6UNPACKING AND INSPECTIONThe main system components are packaged separately:• Track/Docking Station, Scanning Head, Cabling, Software,Documentation, and Accessories• Vacuum PumpAfter removing the components from each shipping carton, inspect them fordamage. If any damage has occurred during shipping, immediately contactthe transportation company that shipped them. Do not proceed withinstallation until the carrier’s agent has inspected the damage.Your components were packaged in specially-designed cartons to helpprevent damage. If reshipment is necessary, the components should bepackaged in the original carton. If the original carton is not available,contact X-Rite to have replacements shipped to you.Packaging Drawings and Parts ListsCheck your package contents against your packing list and original order. Adetailed packaging drawing and parts list is included in this manual asAppendix B.