Installation24VideoJet 100Switching on / Switching offMains connection The scope of supply of the VideoJet 100 includes a plug-in powerpack.The VideoJet 100 has no mains power switch. When you have con-nected the plug-in power supply unit to the VideoJet 100 andinserted the plug of the plug-in power supply unit into a plug socket,the server is ready for operation." Push the plug of the power supply unit cable into the jack POWERuntil it latches." Plug the plug-in power supply unit into a fused mains power plugsocket. The green LED POWER on the front of the VideoJet 100lights up and the server is ready for operation.When the network connection has been correctly made, the greenLED ETHERNET also lights up. The flashing yellow LED signalsthe transport of data packages via the network.Attention!Use only the plug-in power supply unit supplied for operation of theVideoJet 100. Take appropriate measures or install the appropriateequipment to prevent surge voltages, interference voltage peaks orpower failures in the mains supply from reaching the server.Connect the VideoJet 100 to the mains power supply only when allthe other connections have been made.