– 21 –Compliant Manager Installation Manual10TEST RUN• A test run is necessary to confirm that the Compliant Manager has recognized air conditioner units after thecentral control address setting.(1) Turn on the power of all connected air conditioners.(2) Turn on the power of the Compliant Manager.(3) Make sure that the number of air conditioners connected to each line (only main units when group control isperformed) equals the group number count displayed on the Compliant Manager.(4) When these numbers are identical, there is no problem.If they differ, set central control addresses again according to “Central Control Address (Group Number)Setting.” Also make sure that there is no incorrect wiring.(1) Press the button for at least 4 seconds. (The “TEST” indication lights in the test run mode.)(2) Press the button and button. (Temperature cannot be set during a test run.)(3) When the test run is completed, press the button to exit the test run mode.11SPECIFICATIONSModel BMS-CM1280TLE BMS-CM1280FTLEPower supply 220-240 VAC 50/60HzPower consumption 3W 5WNumber of connectable indoor units (TCC-LINK) 128 Units (LINE1 64 Units, LINE2 64 Units)Energy Monitoring Relay Interface (RS-485) 4 Units (max.)Digital Input/Output Relay Interface 4 Units (max.)Operating temperature 0 to 40°C to 90%RHDimensions -20 to +60°C (no condensation)Mass 120 (H) × 180 (W) × 88 (D)Weight 1.1Kg 1.2Kg20-EN