Setting an Interval ScheduleTurn the control dial to the watering daysposition.Check the programs switch setting. If necessary,reposition the switch to select the desired program.The current watering schedule will be displayed. IfInt (Interval) is not displayed, press the +/on or –/offbutton as needed to select Int.Press the next button. The current Interval number(1–7) will begin flashing.To change the Interval number, press the +/on or–/off button until the desired number is flashing.Press the next button. The Interval start day willbegin flashing.To change the Interval start day, press the +/onbutton or the –/off button until the desired day isflashing.8. To set an Interval schedule for another program,repeat all of the steps beginning at step.When you have completed setting the Intervalschedule for each program (as needed), return thecontrol dial to the run position.Note: The Day Exclusion feature enables you toselect any day(s) of the week to be excluded andremain off when using an Interval or Odd/Evenwatering schedule. See page 25 for detailedinformation.7623947557 43 5361