Mobile WiMAX/TD-LTE RRH-2WB Installation Manual/Ver.2.0© SAMSUNG Electronics Co., Ltd. 3-31Table 3.10 Construction Situation Checklist (Continued)Category Check Items CriteriaResultRemarksPass FailGroundConstructionGround line standard Visual inspectionGround bar ↔ System Visual inspectionGround line cabling status Cabling status checkTermination treatment of theground line (pressureterminal)Visual inspectionFeeder LineStatusFeeder line cabling andlocking statusBeauty, robustness andBendingANT installation andattachment statusVisual inspection(ANT bar’s vibrationstatus)Connection and finish status Beauty and robustnessVariousTAG StatusFeeder tag Visual inspection(Information mentioned:length, loss value,location)Power cable tag Visual inspection(Power Identification)Ground table tag Visual inspectionAttachment status of thelabel for the real-nameconstruction system- Indoor: wall side of the gateside- Outdoor: inside of thecover of the distribution boxVisual inspection(size and material)FinishStatusCable duct bolt’s attachmentstatusVisual inspectionFeeder inlet finish treatmentstatusVisual inspection (checkif the rear part isattached)Status of inside/outside ofthe system and vicinity of thebase stationVisual inspectionGeneralOpinion