Installation and Service Manual11INSTALLATIONDRAINSRight Side of unit as shipped:1. During installation all drains on right side of the unitmust be properly routed.2. Remove right side lower panel to access the drainpan (A), icemaker (B) and auger (C) drains.(see figure 1)3. Route drain pan drain (A) through cut-out in base-plate (D) and follow all national plumbing codes.4. Route Icemaker drain (B) through cut-out in base-plate (D) and follow all national plumbing codes.(see figure 2)5. Pull the insulation covering the auger drain (C) overthe clamp and fittings on the auger base (E).6. Route auger drain (C) through cut-out in baseplate(D) and follow all national plumbing codes.Drain Kit:1. Attach Drain Kit (figure 3) to barbed gray drain el-bow (F). Use worm gear clamp that is provided tosecure the hose to the barb.2. Route the drain hose through the opening in theLP-3 base plate (D). Follow all local & nationalplumbing codes.(see figure 5)3. Pull the insulation (G) on the drain kit over the graydrain elbow and the CPVC drain fitting until it is flushwith the stainless steel side panel (H).AEBCDEBCDFIGURE 1DHGFIGURE 4 FIGURE 5FIGURE 2FIGURE 3F