Page 66 SmartFOAMINSTALLATION AND DELIVERY CHECKLISTAfter the Hale SmartFOAM system is installed, use the following check list to verify installation and ensure proper systemsetup when the apparatus is delivered to the end user.INSTALLATIONDate Initials Checklist item❑ System properly installed. (“Start-Up Check List”)❑ Tank level sensor function verified. (“System Installer Start-Up”)❑ Foam pump operation checked. (“System Installer Start-Up”)❑ Foam tank and hoses drained of water. (“System Installer Start-Up”)❑ Flow sensor function checked and calibrated. (“User Calibration”)DELIVERYDate Initials Checklist item❑ Foam tank filled with user specified foam concentrate. (Complies with Haleapproved concentrate compatibility list.)❑ Foam pump priming checked.❑ Water flow sensor calibration verified with Pitot and smooth bore nozzle.❑ Default simulated water flow value set to end user specification.❑ Foam preset text and injection rates set to end user specification.❑ Foam concentrate feedback value verified and calibrated with end user specifiedfoam.❑ Proper Hale SmartFOAM system operation demonstrated to end user in accordancewith manual procedures.❑ End user trained in proper operation of Hale SmartFOAM system in accordance withmanual procedures.❑ Warranty registration card filled out by end user and mailed to Hale Products.❑ Two copies of Description, Installation, and Operation manual provided to end user.