1318. Clear work space and carefully lift the Boiler heat exchanger onto the 3 rawl bolts, fitnuts (the long nut is for the top bolt). Tighten nuts sufficiently to set rawl bolts inthe wall.19. Adjust for level and tighten the 3 rawl bolt nuts.20. Fit the flue as per instructions supplied with the flue kit.ALL MODELS21. Make water connections.22. Make oil pipe connections, see 5-2.5.23. Fit side panels, bottom panel and top panel.24. Fit Control Panel, see 5-2.4.5-2.4 Connecting Control PanelInternal Wall Mounted Boilers are despatched with the Control Panel fitted. The phials ofthe thermostats are inserted horizontally in the pockets situated in the heat exchanger,see fig. 5-2e.The mains electricity supply, preferably from a spur switched and fused 5 amp, shouldenter the Boiler casing through one of the holes or knockouts provided - see fig. 5-2c.The Burner is supplied with a 4 wire cable and plug. The plug fits into the Burner supplysocket on the Control Panel.A 3 pin plug is provided for connection to the mains supply. This plug fits into the socketin the rear of the Control Panel.IMPORTANTDo not trap phial capillary tubes behind access covers.INSTINSTINSTINSTINSTALLAALLAALLAALLAALLATION 5TION 5TION 5TION 5TION 5NoteUse cardboard box to protect worktop.WWWWWARNINGARNINGARNINGARNINGARNINGThe weight of the Boiler Heat Exchangerbare is 50kg (110 lbs) - it is a two personjob to lift it in place.Fig. 5-2d Internal Casing AssemblyW50/80I SHOWNFig. 5-2e Phial Positions LIMIT STAT PHIALCONTROL STAT PHIALFIT PHIALS IN EITHER 1 OR 2BURNER CABLE5050505050 kgkgkgkgkg55555