210Copyright© 2013-2015 Fujitsu General Limited. All rights reserved.VRF ExplorerOperationThe Flow of the Process up to Operation22.This process flow is from the configuration of the electricity meter until the configuration and operation ofthe System Controller Lite.● Energy saving understand, precautions conformation(24-1 Overview)● Understanding apportionment of electricity, and checking points of caution(27-1 Overview)Check the items to be decided beforehandInstalling the meterConfiguring the outdoor unit’s PCB(36. The Settings of Outdoor Unit and System Controller Lite)Unit registration(8-3-3. Unit registration)Electricity charge apportionment (operation)(28. Electricity Charge Apportionment)Indoor Unit Setting(27-4 Indoor unit electricity calculation setting)Parameter Setting(27-5 Parameter setting)Contract Setting(27-6 Contract setting)Block Less Contract(27-7 Block setting)Electricity meter system settings(23. Creating an electricity meter system)Group setting(25-1 Energy saving group setting)Indoor unit rotation operation(25-2 Indoor unit rotation operation)Outdoor unit capacity save(25-3 Outdoor unit capacity save)Peak cut operation(25-4 Peak cut operation)Each type of setting itemEnergy saving function Electricity apportionmentfunctionBasic Setting(27-3 Basic Setting)