5. Locate center pulley assembly in loose parts bagand place in proper hole.SPINDLE PULLEY6. Locate two (2) V-belts in the loose parts bag,7, Use speed chart inside belt guard to choose speedfor drilling operation. Install belts in correct positionfor desired speed, The longer of the two belts isalways positioned between the spindle pulley andidler pulley.NOTE: Refer to inside belt guard for RecommendedDrilling Speeds.8. Apply tension to belt by turning Belt Tension Handlecounter clockwise until belt deflects approximately1/2 inch by thumb pressure at its center.9, Tighten Belt Tension Lock Handles.NOTICE: Over tensioning belt may cause motornot to start or damage bearings.10. If belt slips while drilling, readjust belt tension.BELTTENSIONHANDLEBELT GUARD KNOB5ram DIA × 8ram LONGSCREWBELT GUARDPAN HD,tNSTALUNG BELT GUARD KNOB1. To attach belt guard knob, locate knob and 5ramDia. x 8mm long pan hd. screw in loose parts bag.Install screw in hole located in guard and attachknob turning until tight,WARNING: To avoid possible injury keep guardl in place and in proper working order while oper-[ating.IDLER PULLEYBELTTENSIONLOCK-- HANDLE!3