BAND-IT-IDEX, Inc.A Unit of IDEX Corporation4799 Dahlia StreetDenver, CO 80216-3070 USAP: 1-800-525-0758F: 1-800-624-3925Document # P36187 Rev. G© CopyrightBAND-IT-IDEX, Inc. 2007All rights reservedwww.BAND-IT-IDEX.comPage 1 of 3G40269 Giant IIHand ToolOperatingInstructions1. Band may be used from bulk roll as thiscompletely eliminates waste of band. Slidebuckle on band as shown, bringing end ofband around object to be clamped andagain through buckle.2. Continue band around object oncemore and again through buckle.Double banding develops a great dealmore radial compression than singlebanding. Bend end of band underbuckle.3. Place band in open of tool nose andgripper block. Move into slot as far aspossible, to avoid buckle sliding into toolnose. Apply tension by turning handle oftool.4. Place finger on BAND-IT Band at bucklebridge while tensioning with tool handle.When you feel BAND-IT Band stop movingthrough buckle as you are turning handle,maximum pressure is being exerted by theBAND-IT Band around object beingclamped. Stop turning handle.5. Roll tool over buckle, backing off withtension handle1- 1½ turns throughout entirerolling operation. Failure to back off tensionwith tension handle throughout entire courseof roll-over may result in breaking of band.There is no loss of tension as band releasedis used up in the bend.6. Pull cutting handle to cut the band.When applying Giant Band clamps, priorto cutting off clamp, release band gripperand push tool nose away from buckleapprox. ¼”.7. Remove tool,holding stub of banddown with thumb.8. Hammerdown buckleears to completeBAND-IT clamp.