www.accuenergy.comV: 1.0 Revised: Aug. 2017AcuRev 131228DIN-Rail Power Meter⚫ The next page will correspond to the PT2 setting. If no PT’s are being used, leave this set-ting as the default and press the “SCROLL” key to go to the next page. If PT’s are being used,enter in the secondary value of the PT here.► Press “SET” to enter edit mode and to change the flashing digit.► Press “SCROLL” to change the value of the digit.► Press “SET” to confirm the setting and move to the next page.⚫ The next page will be “S-12” for setting the primary value of the PT if it is being used.► Press “SET” to enter edit mode and to change the flashing digit.► Press “SCROLL” to change the value of the digit.► Press “SET” to confirm the setting and move to the next page.The Initial Setup is now complete. The meter will should now begin to read the data correctly.4.2 Energy Pulse OutputThe AcuRev 1312 supports the transmission of pulses through the P1 and P2 terminals of themeter. The AcuRev 1312 uses the KZ output to transmit test pulses that are proportional to theaccumulated energy that the meter is measuring.The maximum output voltage and current of the pulse output circuit in the AcuRev 1312 are250V and 100mA respectively.Configuration:Ensure the following configurations in the meter are correct to ensure the accuracy of the meter:⚫ Wiring Mode⚫ CT2⚫ CT1⚫ PT2⚫ PT1To check these settings, refer to section 4.1 to ensure the meter was configured.With the above settings confirmed to ensure the meter will measure the voltage and currentaccurately, the next step is to configure the meter to output the desired number of pulses basedon the required specification.