Lenovo ThinkSystem DS4200 manuals
ThinkSystem DS4200
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- About this guide
- CNC ports used for host connection
- Prerequisites
- Document conventions and symbols
- Safety guidelines
- Electrical safety
- Rack system safety precautions
- System overview
- U12 enclosure system – isometric front orientation
- U24 enclosure system – isometric front orientation
- U84 enclosure system – isometric front and rear orientations
- Enclosure variants
- U enclosure core product
- U enclosure rear panel
- port FC/iSCSI controller module detail (DS6200/DS4200)
- port HD mini-SAS controller module detail (DS2200 only)
- U enclosure chassis
- U12 enclosure chassis – isometric front orientation
- U enclosure front panel
- Operator's (Ops) panel
- U enclosure Ops panel
- LEDs: Ops panel – 5U enclosure front panel
- Power cooling module – 2U enclosures
- System airflow
- Fan cooling module – 5U enclosures
- Controller and expansion modules
- LEDs:DS6200/DS4200 FC/iSCSI controller modules (FC and 10GbE SFPs)
- LEDs: DS6200/DS4200 iSCSI controller module (1Gb RJ-45 SFPs)
- LEDs: DS2200 FC/iSCSI controller modules (FC or 10GbE SFPs)
- LEDs: DS2200 iSCSI controller module (1Gb RJ-45 SFPs)
- Controller failure when a single-controller is operational
- LEDs: Rear panel "Cache Status
- Gb/s expansion module LEDs
- Disk drive module
- Dual path LFF 3.5" disk drive carrier modules
- Drive status indicators
- DDIC in 5U chassis
- Enclosure management
- Installation
- Planning for installation
- Preparing the site and host server
- Unpacking the 2U12 and 2U24 enclosures
- Required tools
- Installing the 5U enclosure
- Securing the brackets to the rail (left hand rail shown for 5U)
- FDE considerations
- Cable requirements for expansion enclosures
- Cabling connections between a 2U controller enclosure and 2U expansion enclosures
- Cabling connections between a 2U controller enclosure and D3284 expansion enclosure–reverse
- Power cord connection
- Grounding checks
- CNC technology
- HD mini-SAS
- Host connection
- Connecting hosts: DS6200/DS4200 direct attach – one server/ one HBA/ dual path
- Connecting hosts: DS6200/DS4200 direct attach – four servers/ one HBA per server/ dual path
- Connecting a management host on the network
- New user setup
- Setting network port IP addresses using the CLI port and cable
- Connecting a USB cable to the CLI port
- Configure controller network ports
- Set IPv4 values for network ports
- Change the CNC port mode
- Cabling for replication
- Connecting two DS6200/DS4200 storage systems for replication: multiple servers/switches/one location
- Connecting two DS2200 storage systems for replication: multiple servers/switches/two locations
- Operation
- Operator's (Ops) panel LEDs
- Accessing the SMC
- Troubleshooting and problem solving
- U enclosure LEDs
- Disk drive carrier module LEDs
- IOM LEDs
- PSU LEDs
- Drawer LEDs
- DDIC LED
- Troubleshooting 2U enclosures
- Thermal monitoring and control
- Troubleshooting 5U enclosures
- Basic steps
- Performing basic steps
- If the enclosure does not initialize
- Isolating a host-side connection fault
- Customer-replaceable units
- CRUs addressing 2U 12-drive chassis
- CRUs addressing 2U 24-drive chassis
- CRUs addressing high-density 5U 84-drive chassis
- SBB IOMs used in DS Series storage enclosures
- Module removal and replacement
- CRU replacement for 2U chassis
- Installing a PCM
- Removing a LFF drive carrier module
- Installing a LFF drive carrier module
- Removing a SFF drive carrier module
- Removing a SFF disk drive module (1 of 2)
- Installing a SFF drive carrier module
- Installing a SFF drive carrier module (1 of 2)
- Replacing a dummy drive carrier
- Configuring partner firmware update
- Shutting down a controller module
- Removing an IOM
- Installing an IOM
- Verifying component operation
- CRU replacement for 5U chassis
- Closing a drawer
- Removing a DDIC (1 of 2)
- Removing a DDIC (2 of 2)
- Installing a DDIC
- Installation guidelines
- Installing a PSU
- Removing an FCM (1 of 2)
- Installing an FCM
- IOM latch operation detail
- A Technical specifications
- Environmental requirements
- Power cooling module
- B Standards and regulations
- AC power cords
- Taiwan BSMI RoHS declaration
- C USB device connection
- Supported host applications
- Using the CLI port and cable—known issues on Windows
- D SFP option for CNC ports
- Verify component operation
- Index