OneStart

Lenovo ThinkSystem DS4200 manuals

ThinkSystem DS4200 first page preview

ThinkSystem DS4200

Brand: Lenovo | Category: Storage
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. About this guide
  11. CNC ports used for host connection
  12. Prerequisites
  13. Document conventions and symbols
  14. Safety guidelines
  15. Electrical safety
  16. Rack system safety precautions
  17. System overview
  18. U12 enclosure system – isometric front orientation
  19. U24 enclosure system – isometric front orientation
  20. U84 enclosure system – isometric front and rear orientations
  21. Enclosure variants
  22. U enclosure core product
  23. U enclosure rear panel
  24. port FC/iSCSI controller module detail (DS6200/DS4200)
  25. port HD mini-SAS controller module detail (DS2200 only)
  26. U enclosure chassis
  27. U12 enclosure chassis – isometric front orientation
  28. U enclosure front panel
  29. Operator's (Ops) panel
  30. U enclosure Ops panel
  31. LEDs: Ops panel – 5U enclosure front panel
  32. Power cooling module – 2U enclosures
  33. System airflow
  34. Fan cooling module – 5U enclosures
  35. Controller and expansion modules
  36. LEDs:DS6200/DS4200 FC/iSCSI controller modules (FC and 10GbE SFPs)
  37. LEDs: DS6200/DS4200 iSCSI controller module (1Gb RJ-45 SFPs)
  38. LEDs: DS2200 FC/iSCSI controller modules (FC or 10GbE SFPs)
  39. LEDs: DS2200 iSCSI controller module (1Gb RJ-45 SFPs)
  40. Controller failure when a single-controller is operational
  41. LEDs: Rear panel "Cache Status
  42. Gb/s expansion module LEDs
  43. Disk drive module
  44. Dual path LFF 3.5" disk drive carrier modules
  45. Drive status indicators
  46. DDIC in 5U chassis
  47. Enclosure management
  48. Installation
  49. Planning for installation
  50. Preparing the site and host server
  51. Unpacking the 2U12 and 2U24 enclosures
  52. Required tools
  53. Installing the 5U enclosure
  54. Securing the brackets to the rail (left hand rail shown for 5U)
  55. FDE considerations
  56. Cable requirements for expansion enclosures
  57. Cabling connections between a 2U controller enclosure and 2U expansion enclosures
  58. Cabling connections between a 2U controller enclosure and D3284 expansion enclosure–reverse
  59. Power cord connection
  60. Grounding checks
  61. CNC technology
  62. HD mini-SAS
  63. Host connection
  64. Connecting hosts: DS6200/DS4200 direct attach – one server/ one HBA/ dual path
  65. Connecting hosts: DS6200/DS4200 direct attach – four servers/ one HBA per server/ dual path
  66. Connecting a management host on the network
  67. New user setup
  68. Setting network port IP addresses using the CLI port and cable
  69. Connecting a USB cable to the CLI port
  70. Configure controller network ports
  71. Set IPv4 values for network ports
  72. Change the CNC port mode
  73. Cabling for replication
  74. Connecting two DS6200/DS4200 storage systems for replication: multiple servers/switches/one location
  75. Connecting two DS2200 storage systems for replication: multiple servers/switches/two locations
  76. Operation
  77. Operator's (Ops) panel LEDs
  78. Accessing the SMC
  79. Troubleshooting and problem solving
  80. U enclosure LEDs
  81. Disk drive carrier module LEDs
  82. IOM LEDs
  83. PSU LEDs
  84. Drawer LEDs
  85. DDIC LED
  86. Troubleshooting 2U enclosures
  87. Thermal monitoring and control
  88. Troubleshooting 5U enclosures
  89. Basic steps
  90. Performing basic steps
  91. If the enclosure does not initialize
  92. Isolating a host-side connection fault
  93. Customer-replaceable units
  94. CRUs addressing 2U 12-drive chassis
  95. CRUs addressing 2U 24-drive chassis
  96. CRUs addressing high-density 5U 84-drive chassis
  97. SBB IOMs used in DS Series storage enclosures
  98. Module removal and replacement
  99. CRU replacement for 2U chassis
  100. Installing a PCM
  101. Removing a LFF drive carrier module
  102. Installing a LFF drive carrier module
  103. Removing a SFF drive carrier module
  104. Removing a SFF disk drive module (1 of 2)
  105. Installing a SFF drive carrier module
  106. Installing a SFF drive carrier module (1 of 2)
  107. Replacing a dummy drive carrier
  108. Configuring partner firmware update
  109. Shutting down a controller module
  110. Removing an IOM
  111. Installing an IOM
  112. Verifying component operation
  113. CRU replacement for 5U chassis
  114. Closing a drawer
  115. Removing a DDIC (1 of 2)
  116. Removing a DDIC (2 of 2)
  117. Installing a DDIC
  118. Installation guidelines
  119. Installing a PSU
  120. Removing an FCM (1 of 2)
  121. Installing an FCM
  122. IOM latch operation detail
  123. A Technical specifications
  124. Environmental requirements
  125. Power cooling module
  126. B Standards and regulations
  127. AC power cords
  128. Taiwan BSMI RoHS declaration
  129. C USB device connection
  130. Supported host applications
  131. Using the CLI port and cable—known issues on Windows
  132. D SFP option for CNC ports
  133. Verify component operation
  134. Index
Related products
ThinkSystemThinkSmart BarThinkServer SA120ThinkSmart Bar 180VSM020
Lenovo categories
More Lenovo categories