Pioneer PHR160-55 manuals
PHR160-55
Table of contents
- for the installer
- Table Of Contents
- Table Of Contents
- Table Of Contents
- B. IMPROPER COMBUSTION
- F. WINTERIZING
- C. OPTIONAL EQUIPMENT
- PART 3 – DIMENSIONS AND CLEARANCES
- PART 4 – PREPARE HEATER LOCATION
- B. LEVELING
- DIRECT VENT INSTALLATION OF EXHAUST AND INTAKE
- F. PREVENT COMBUSTION AIR CONTAMINATION
- PART 5 – PREPARE THE HEATER
- PART 6 – HEATER PIPING
- C. BACKFLOW PREVENTER
- F. INDIRECT FIRED WATER HEATER SCALDING
- H. FILL AND PURGE HEATING SYSTEM
- I. ZONING WITH ZONE VALVES
- L. PIPING DETAIL
- PART 7 – VENTING, COMBUSTION AIR AND CONDENSATE REMOVAL
- C. EXHAUST AND INTAKE AIR VENT PIPE LOCATION
- D. EXHAUST AND INTAKE AIR VENT SIZING
- E. LONGER VENT RUNS
- F. EXHAUST VENT AND INTAKE AIR PIPE INSTALLATION
- G. VENTING DRAWINGS
- INDOOR COMBUSTION AIR INSTALLATION IN CONFINED OR UNCONFINED SPACE
- H. EXHAUST VENT AND INTAKE AIR PIPE INSTALLATION
- J. CONDENSATE REMOVAL SYSTEM
- PART 8 – FIELD WIRING
- C. LINE VOLTAGE WIRING FOR STANDARD HEATER
- E. OUTDOOR SENSOR (OPTIONAL)
- H. UL353 LOW WATER CUT-OFF INTERFACE KIT (OPTIONAL
- J. CASCADE MASTER PUMP AND SENSOR WIRING
- K. CASCADE FOLLOWER PUMP AND SENSOR WIRING
- A. CHECK/CONTROL WATER CHEMISTRY
- C. FILL AND TEST WATER SYSTEM
- F. FINAL CHECKS BEFORE STARTING HEATER
- B. CASCADE SYSTEM
- D. STATUS MENU
- E. TEST MODE
- F. PURGE AIR FROM WATER SYSTEM
- PART 12 – TROUBLESHOOTING
- PART 13: MAINTENANCE
- MAINTENANCE NOTES
- HTP CUSTOMER INSTALLATION RECORD FORM