OneStart

Cisco ONS 15310-MA SDH manuals

ONS 15310-MA SDH first page preview

ONS 15310-MA SDH

Brand: Cisco | Category: Multi-service Platforms
ONS 15310-MA SDH first page preview

ONS 15310-MA SDH

Brand: Cisco | Category: Network Hardware
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. Table Of Contents
  11. Table Of Contents
  12. Table Of Contents
  13. Table Of Contents
  14. Table Of Contents
  15. Table Of Contents
  16. Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release
  17. revision history
  18. related documentation
  19. Before You Begin
  20. Chapter 1 Install the Cisco ON 15310-MA SDH
  21. Tools Needed
  22. NTP- H150 Install the Shelf Assembly
  23. NTP- H169 Install the Cable Management Bracket
  24. Figure
  25. NTP- H166 Remove the Blank Sheet Metal Covers
  26. NTP- H167 Install the EIAs
  27. NTP- H151 Install the Power and Ground
  28. NTP- H189 View Shelf Temperature
  29. Installing the Fan-Tray Air Filter
  30. NTP- H153 Install the 15310E-CTX-K9 Cards
  31. Installing a 15310E-CTX-K9 Card
  32. NTP- H154 Install the Ethernet Cards
  33. NTP- H187 Install STM-N Cards and Connectors
  34. NTP- H155 Install the Electrical Cards
  35. NTP- H156 Install the Filler Cards
  36. NTP- H157 Install Wires to Alarm, Timing, Craft, LAN, and UDC Pin Connections
  37. NTP- H158 Install the Electrical Cables
  38. NTP- H159 Install and Remove SFPs
  39. NTP- H160 Install Optical Cables
  40. NTP- H164 Perform the Shelf Installation Acceptance Test
  41. NTP- H161 Preprovision an SFP Slot
  42. NTP- H162 Preprovision a Card Slot
  43. NTP- H168 Install the Front Door
  44. Installing the Front Door
  45. NTP- H190 Install the Rear Cover
  46. Chapter 2 Connect the PC and Log into the GUI
  47. NTP- H14 Set Up TL1 session for Local Craft Connection to the Node
  48. Chapter 3 Turn Up a Node
  49. NTP- H19 Create Users and Assign Security
  50. NTP- H21 Set Up CTC Network Access
  51. NTP- H177 Set Up the ONS 15310-MA SDH in EMS Secure Access
  52. ONS 15310-MA SDH Nodes Residing Behind a Firewall
  53. NTP- H276 Create FTP Host
  54. NTP- H23 Set Up Timing
  55. NTP- H25 Set Up SNMP
  56. NTP- H131 Provision OSI
  57. NTP- H180 Provision Node for SNMPv3
  58. NTP- H181 Provision Node to Send SNMPv3 Traps
  59. NTP- H183 Automatically Provision a GNE to Manage an ENE using SNMPv3
  60. NTP- H184 Manually Provision a GNE/ENE to Send SNMPv3 Traps from an ENE using SNMPv3
  61. NTP- H185 Automatically Provision a GNE/ENE to Send SNMPv3 Traps from an ENE Using SNMPv3
  62. NTP- H26 Verify Node Turn-Up
  63. Chapter 4 Turn Up a Network
  64. NTP- H29 Provision a Linear ADM Network
  65. NTP- H30 Linear ADM Network Acceptance Test
  66. NTP- H31 Provision Path Protection Nodes
  67. ONS 15310-MA SDH Path Protection Fiber Connection Example
  68. NTP- H32 Path Protection Acceptance Test
  69. NTP- H33 Provision an Open-Ended Path Protection Configuration
  70. ONS 15310-MA SDH Open-Ended Path Protection Configurations Fiber Connection Example
  71. NTP- H34 Open-Ended Path Protection Acceptance Test
  72. Traditional Path Protection DRI Fiber Connection Example
  73. Integrated Path Protection DRI Example
  74. NTP- H35 Create a Logical Network Map
  75. C H A P T E R 5 Create Circuits and VC Low-order Path Tunnels
  76. NTP- H36 Verify Network Turn-Up
  77. NTP- H37 Create an Automatically Routed E1 Circuit
  78. NTP- H38 Create a Manually Routed E1 Circuit
  79. NTP- H39 Create a Unidirectional E1 Circuit with Multiple Drops
  80. NTP- H40 Create an Automatically Routed DS-3 or E3 Circuit
  81. NTP- H41 Create a Manually Routed DS-3 or E3 Circuit
  82. NTP- H42 Create a Unidirectional DS-3 or E3 Circuit with Multiple Drops
  83. NTP- H46 Test Electrical Circuits
  84. NTP- H43 Create an Automatically Routed VC Low-order Path Tunnel
  85. NTP- H44 Create a Manually Routed VC Low-order Path Tunnel
  86. NTP- H45 Create a VC Low-order Path Aggregation Point
  87. NTP- H47 Create an Automatically Routed Optical Circuit
  88. NTP- H48 Create a Manually Routed Optical Circuit
  89. NTP- H49 Create a Unidirectional Optical Circuit with Multiple Drops
  90. NTP- H50 Test Optical Circuits
  91. NTP- H51 Create an Automatically Routed VCAT Circuit
  92. NTP- H52 Create a Manually Routed VCAT Circuit
  93. NTP- H55 Create Overhead Circuits
  94. NTP- H140 Create a Server Trail
  95. NTP- H179 Create an Overlay Ring Circuit
  96. NTP- C186 Manually Create a CCAT or VCAT Circuit on the CE-MR-10 Card
  97. NTP- H188 Create an Ethernet Drop and Continue Circuit
  98. NTP- H69 Locate and View Circuits
  99. Chapter 6 Manage Circuit
  100. NTP- H72 Modify and Delete Overhead Circuits and Server Trails
  101. NTP- H144 Create a J0 Section Trace
  102. NTP- H74 Create a J1 Path Trace
  103. NTP- H129 Bridge and Roll Traffic
  104. NTP- H76 Reconfigure Circuits
  105. Chapter 7 Monitor Performance
  106. NTP- H65 Monitor Electrical Performance
  107. NTP- H66 Monitor Optical Performance
  108. NTP- H68 Create or Delete Ethernet RMON Thresholds
  109. NTP- H175 Enable or Disable AutoPM
  110. NTP- H56 Document Existing Provisioning
  111. Chapter 8 Manage Alarm
  112. ONS 15310-MA SDH Node View Conditions Window
  113. NTP- H59 View Alarm-Affected Circuits
  114. NTP- H60 Create, Download, and Assign Alarm Severity Profiles
  115. NTP- H61 Enable, Modify, or Disable Alarm Severity Filtering
  116. NTP- H63 Provision External Alarms and Controls
  117. Chapter 10 Change Node Setting
  118. NTP- H133 Modify OSI Provisioning
  119. NTP- H80 Customize the CTC Network View
  120. NTP- H82 Change Node Timing
  121. NTP- H83 Modify Users and Change Security
  122. NTP- H84 Change SNMP Settings
  123. Chapter 11 Upgrade Card and Span
  124. NTP- H170 Upgrade STM-M Spans Automatically
  125. NTP- H186 Upgrade Optical Spans Manually
  126. C H A P T E R 12 Convert Network Configurations
  127. NTP- H93 Convert a Point-to-Point to a Linear ADM Manually
  128. Automatically
  129. Chapter 13 Add and Remove Node
  130. NTP- H98 Remove a Path Protection Node
  131. NTP- H99 Add an End Node to a Linear ADM
  132. NTP- H135 Add a Non-ONS 15310-MA Node to a Linear ADM
  133. NTP- H101 Remove an In-Service Node from a Linear ADM
  134. NTP- H102 Back Up the Database
  135. Chapter 14 Maintain the Node
  136. NTP- H132 View and Manage OSI Information
  137. NTP- H104 Restore the Node to Factory Configuration
  138. NTP- H105 View the Audit Trail Records
  139. Viewing Audit Trail Records
  140. NTP- H106 Offload the Audit Trail Record
  141. NTP- H107 Off-Load the Diagnostics File
  142. NTP- H108 Initiate or Clear an External Switching Command
  143. NTP- H109 Clean Fiber Connectors
  144. NTP- H145 Replace the Fan-Tray Assembly
  145. NTP- H134 Reset Cards Using CTC
  146. NTP- H114 View the Loopback Status on a Port
  147. NTP- H115 Switch the Node Timing Reference
  148. NTP- H137 Edit Network Element Defaults
  149. NTP- H138 Import Network Element Defaults
  150. NTP- H139 Export Network Element Defaults
  151. Chapter 15 Power Down the Node
  152. DLP- H1 Unpack and Verify the Shelf Assembly
  153. DLP- H3 Mount the ONS 15310-MA SDH in a Rack
  154. DLP- H4 Mount Multiple ONS 15310-MA SDH Shelf Assemblies in a Rack
  155. DLP- H6 Connect AC Office Power to the ONS 15310-MA SDH
  156. DLP- H7 Connect DC Office Power to the ONS 15310-MA SDH
  157. DLP- H8 Turn On and Verify DC Office Power on the ONS 15310-MA SDH
  158. DLP- H10 Install Timing Cables on the ONS 15310-MA SDH
  159. DLP- H11 Install the Serial Cable for an ONS 15310-MA SDH TL1 Craft Interface
  160. DLP- H12 Install the UDC Cable on the ONS 15310-MA SDH
  161. DLP- H13 Install LFH Cables for ONS 15310-MA SDH E1 Connections
  162. DLP- H14 Install DS-3/E3 Cables With MiniBNC Connectors on the ONS 15310-MA SDH
  163. DLP- H15 Route Cables on the ONS 15310-MA SDH
  164. DLP- H16 Install SFP Connectors
  165. DLP- H17 Remove SFP Connectors
  166. DLP- H19 Install Fiber-Optic Cables for Path Protection Configurations
  167. DLP- H20 Measure Voltage
  168. DLP- H21 Run the CTC Installation Wizard for Windows
  169. DLP- H22 Run the CTC Installation Wizard for UNIX
  170. Using Static IP Addresses
  171. DLP- H24 Set Up a Windows PC for Craft Connection to ONS 15310-MA SDH Using Dynamic Host Configuration Protocol
  172. DLP- H25 Set Up a Windows PC for Craft Connection to an ONS 15310-MA SDH Using Automatic Host Detection
  173. DLP- H27 Disable Proxy Service Using Internet Explorer (Windows)
  174. DLP- H28 Disable Proxy Service Using Netscape (Windows)
  175. DLP- H29 Log into CTC
  176. Warning Message Window
  177. Logging into CTC
  178. DLP- H30 Install Public-Key Security Certificate
  179. DLP- H32 Add a Node to the Current Session or Login Group
  180. DLP- H33 Delete a Node from the Current Session or Login Group
  181. DLP- H34 Delete a Node from a Specified Login Node Group
  182. DLP- H36 Configure the CTC Alerts Dialog for Automatic Popup
  183. DLP- H38 Create a New User on Multiple Nodes
  184. DLP- H39 Provision IP Settings
  185. DLP- H40 Create a Static Route
  186. DLP- H41 Set Up or Change Open Shortest Path First Protocol
  187. DLP- H42 Set Up or Change Routing Information Protocol
  188. DLP- H43 Provision the IIOP Listener Port on ONS 15310-MA SDH
  189. DLP- H45 Set Up External or Line Timing
  190. DLP- H46 Set Up Internal Timing
  191. DLP- H47 Provision a Proxy Tunnel
  192. DLP- H48 Provision a Firewall Tunnel
  193. DLP- H49 Create a Provisionable Patchcord
  194. DLP- H50 Change the Service State for a Port
  195. DLP- H52 Provision Section DCC Terminations
  196. DLP- H53 Provision Line DCC Terminations
  197. DLP- H54 Optical 1+1 Protection Test
  198. DLP- H55 Path Protection Switching Test
  199. DLP- H56 Assign a Name to a Port
  200. DLP- H58 Provision a E1 Circuit Source and Destination
  201. DLP- H59 Provision VC high-order path and VC Low-order Path Grooming Nodes
  202. DLP- H60 Provision a E1, DS-3, or E3 Circuit Route
  203. DLP- H61 Provision a DS-3 or E3 Circuit Source and Destination
  204. DLP- H62 Provision a VC Low-order Path Tunnel Route
  205. DLP- H63 Provision an STM-M Circuit Source and Destination
  206. DLP- H64 Provision an STM-M Circuit Route
  207. DLP- H66 Provision a VCAT Circuit Route
  208. DLP- H67 Create a DCC Tunnel
  209. DLP- H68 Create a User Data Channel Circuit
  210. DLP- H69 Create an IP-Encapsulated Tunnel
  211. DLP- H72 View Alarms
  212. DLP- H73 View Alarm or Event History
  213. DLP- H74 Change the Maximum Number of Session Entries for Alarm History
  214. DLP- H75 Display Alarms and Conditions Using Time Zone
  215. DLP- H77 View Conditions
  216. DLP- H78 Search for Circuits
  217. DLP- H79 Create a Cloned Alarm Severity Profile
  218. Store Profile(s) Dialog Box
  219. DLP- H80 Download an Alarm Severity Profile
  220. DLP- H81 Apply Alarm Profiles to Ports
  221. DLP- H82 Apply Alarm Profiles to Cards and Nodes
  222. DLP- H83 Delete Alarm Severity Profiles
  223. DLP- H84 Enable Alarm Filtering
  224. DLP- H85 Modify Alarm and Condition Filtering Parameters
  225. Alarm Filter Dialog Box Conditions Tab
  226. DLP- H86 Suppress Alarm Reporting
  227. DLP- H87 Discontinue Alarm Suppression
  228. DLP- H88 Disable Alarm Filtering
  229. DLP- H90 Refresh Electrical or Optical PM Counts at Fifteen-Minute Intervals
  230. DLP- H91 Refresh Electrical or Optical PM Counts at One-Day Intervals
  231. DLP- H93 Monitor Far-End PM Counts
  232. DLP- H94 Reset Current PM Counts
  233. DLP- H95 Clear Selected PM Counts
  234. DLP- H96 Set Auto Refresh Interval for Displayed PM Counts
  235. DLP- H97 Monitor PM Counts for Selected Signal Types
  236. DLP- H98 Enable Pointer Justification Count Performance Monitoring
  237. DLP- H99 Enable Intermediate-Path Performance Monitoring
  238. DLP- H100 View Optical STM-M PM Parameters
  239. DLP- H102 View Ether Ports and POS Ports Utilization PM Parameters
  240. DLP- H103 Refresh Ethernet PM Counts at a Different Time Interval
  241. DLP- H106 Delete Ethernet RMON Alarm Thresholds
  242. DLP- H109 Filter the Display of Circuits
  243. DLP- H110 View Circuits on a Span
  244. DLP- H111 Change a Circuit Service State
  245. DLP- H112 Edit a Circuit Name
  246. DLP- H113 Change Active and Standby Span Color
  247. DLP- H114 Edit Path Protection Circuit Path Selectors
  248. DLP- H115 Delete Circuits
  249. DLP- H116 Add a Member to a VCAT Circuit
  250. DLP- H117 Delete a Member from a VCAT Circuit
  251. DLP- H118 Change Tunnel Type
  252. DLP- H120 Delete Overhead Circuits
  253. DLP- H121 Provision Path Trace on Circuit Source and Destination Ports
  254. DLP- H122 Provision Path Trace on STM-M Ports
  255. DLP- H123 Change the Node Name, Date, Time, and Contact Information
  256. DLP- H124 Change the Login Legal Disclaimer
  257. DLP- H125 Change IP Settings
  258. DLP- H126 Modify a Static Route
  259. DLP- H128 Disable Open Shortest Path First Protocol
  260. DLP- H130 Delete a Firewall Tunnel
  261. DLP- H132 Change to the Default Network View Background Map
  262. DLP- H134 Create Domain Icons
  263. DLP- H135 Manage Domain Icons
  264. DLP- H136 Enable Dialog Box Do-Not-Display Option
  265. DLP- H137 Modify a 1+1 Protection Group
  266. DLP- H139 Change the Node Timing Source
  267. DLP- H140 Verify Timing in a Reduced Ring
  268. DLP- H141 Change the Security Policy on a Single Node
  269. DLP- H142 Change the Security Policy on Multiple Nodes
  270. DLP- H143 Change Node Access and PM Clearing Privilege
  271. DLP- H144 Change User Password and Security Settings on a Single Node
  272. DLP- H146 Delete a User on a Single Node
  273. DLP- H147 Delete a User on Multiple Nodes
  274. DLP- H149 Log Out a User on Multiple Nodes
  275. DLP- H150 Modify SNMP Trap Destination
  276. DLP- H151 Delete SNMP Trap Destinations
  277. DLP- H153 Change a Line DCC Termination
  278. DLP- H155 Delete a Line DCC Termination
  279. DLP- H163 Check the Network for Alarms and Conditions
  280. DLP- H164 Manually Route a Path Protection Circuit in a Topology Upgrade
  281. DLP- H166 Initiate a Path Protection Force Switch on a Span
  282. DLP- H167 Clear a Path Protection Force Switch
  283. Reinitialization Tool in Windows
  284. DLP- H170 Use the Reinitialization Tool to Clear the Database and Upload Software (UNIX)
  285. DLP- H171 Apply a Lock-on
  286. DLP- H172 Apply a Lockout
  287. DLP- H174 Clean Multi Fiber-Optic Cable Connectors
  288. DLP- H175 Clean Fiber Connectors with CLETOP
  289. DLP- H177 Manual or Force Switch the Node Timing Reference
  290. DLP- H179 Initiate an Optical Protection Switch
  291. DLP- H180 Change a VCAT Member Service State
  292. DLP- H181 Install the LAN Cable for CTC Interface
  293. DLP- H182 Turn On and Verify AC Office Power
  294. Selecting a Path
  295. Selecting a New Endpoint
  296. DLP- H184 Roll One Cross-Connect from an Optical Circuit to a Second Optical Circuit
  297. DLP- H185 Roll Two Cross-Connects on One Optical Circuit Using Automatic Routing
  298. DLP- H186 Roll Two Cross-Connects on One Optical Circuit Using Manual Routing
  299. DLP- H187 Roll Two Cross-Connects from One Optical Circuit to a Second Optical Circuit
  300. DLP- H188 Delete a Roll
  301. DLP- H190 Provision CE-100T-8 and CE-MR-6 Card Ethernet Ports
  302. DLP- H191 Provision CE-100T-8 and CE-MR-6 Card POS Ports
  303. DLP- H192 Provision a Multirate Pluggable Port Module
  304. DLP- H194 Change the Optical Line Rate
  305. DLP- H195 Delete Pluggable Port Modules
  306. DLP- H196 Configure the Node for RADIUS Authentication
  307. RADIUS Server Tab
  308. DLP- H197 View and Terminate Active Logins
  309. DLP- H200 Provision OSI Routing Mode
  310. DLP- H201 Provision or Modify TARP Operating Parameters
  311. DLP- H202 Add a Static TID to NSAP Entry to the TARP Data Cache
  312. DLP- H204 Add a TARP Manual Adjacency Table Entry
  313. DLP- H205 Provision OSI Routers
  314. DLP- H207 Enable the OSI Subnet on the LAN Interface
  315. DLP- H208 Create an IP-Over-CLNS Tunnel
  316. DLP- H209 Remove a TARP Manual Adjacency Table Entry
  317. DLP- H211 Edit the OSI Router Configuration
  318. DLP- H213 Edit an IP-Over-CLNS Tunnel
  319. DLP- H214 Delete an IP-Over-CLNS Tunnel
  320. DLP- H215 View IS-IS Routing Information Base
  321. DLP- H217 Manage the TARP Data Cache
  322. DLP- H218 Soft-Reset a 15310E-CTX-K9 Card Using CTC
  323. DLP- H219 Hard-Reset the 15310E-CTX-K9 Card Using CTC
  324. DLP- H220 Soft-Reset an Ethernet or Electrical Card Using CTC
  325. DLP- H221 Hard-Reset an Ethernet or Electrical Card Using CTC
  326. DLP- H224 Change Optics Thresholds Settings for Optical Ports
  327. DLP-H225 Set Up SNMP for a GNE
  328. DLP- H227 Format and Enter NMS Community String for SNMP Command or Operation
  329. DLP- H228 Provision Orderwire
  330. DLP- H229 Consolidate Links in Network View
  331. DLP- H231 Adjust the Java Virtual Memory Heap Size
  332. DLP- H233 Change Line and Threshold Settings for E1 Ports
  333. DLP- H234 Grant Superuser Privileges to Provisioning Users
  334. DLP- H235 Change the OSI Routing Mode
  335. DLP- H236 Change Line and Threshold Settings for DS-3 Ports
  336. DLP- H238 Change Optical Port Line Settings
  337. DLP- H239 Change Optical Port SDH Thresholds Settings
  338. DLP- H241 Edit Path Protection Dual-Ring Interconnect Circuit Hold-Off Timer
  339. DLP- H245 Modify a 1:1 Protection Group for the ONS 15310-MA SDH
  340. DLP- H251 Connect Office Power to the ONS 15310-MA SDH
  341. DLP- H252 Turn On and Verify Office Power to the ONS 15310-MA SDH
  342. DLP- H253 Install External Alarm Cables on the ONS 15310-MA SDH
  343. DLP- H254 Install Timing Cables on the ONS 15310-MA SDH
  344. DLP- H255 Install the Serial Cable for TL1 Craft Interface on the ONS 15310-MA SDH
  345. DLP- H256 Install the UDC Cable on the ONS 15310-MA SDH
  346. DLP- H258 Install CHAMP Cables for E1 Connection
  347. DLP- H259 Install DS-3/E3 Cables
  348. DLP- H260 Route Cables
  349. DLP- H265 Set Up a Solaris Workstation for a Craft Connection to an ONS 15310-MA SDH
  350. DLP- H267 Install the CTC Launcher Application from a Release 9.1 and Release 9.2 Node
  351. DLP- H268 Connect to ONS Nodes Using the CTC Launcher
  352. DLP- H269 Create a TL1 Tunnel Using the CTC Launcher
  353. DLP- H270 Create a TL1 Tunnel Using CTC
  354. DLP- H271 View TL1 Tunnel Information
  355. DLP- H272 Edit a TL1 Tunnel Using CTC
  356. DLP- H273 Delete a TL1 Tunnel Using CTC
  357. DLP- H274 Provision the Designated SOCKS Servers
  358. DLP- H275 Install or Reinstall the CTC JAR Files
  359. DLP- H276 Configuring Windows Vista to Support CTC
  360. DLP- H277 Create User Defined Alarm Types
  361. DLP- H279 Change SDH Threshold Settings for STM-N Cards
  362. DLP- H280 Path Protected Switching Test
  363. DLP- H281 Initiate a Path Protected Force Switch
  364. DLP- H282 Create an SNMPv3 User
  365. DLP- H283 Create MIB Views
  366. DLP- H285 Configure SNMPv3 Trap Destination
  367. DLP- H286Delete SNMPv3 Trap Destination
  368. DLP- H287 Create Notification Filters
  369. DLP- H289 Automatically Configure the SNMPv3 Proxy Forwarder Table
  370. DLP- H290 Manually Configure the SNMPv3 Proxy Trap Forwarder Table
  371. DLP- H291 Automatically Configure the SNMPv3 Proxy Trap Forwarder Table
  372. DLP- H292 Perform a Manual Span Upgrade on an SNCP
  373. DLP- H293 Perform a Manual Span Upgrade on a 1+1 Protection Group
  374. DLP- H294 Perform a Manual Span Upgrade on an Unprotected Span
  375. CTC Mouse Options
  376. Equipment Inventory
Related products
ONS 15310-MAONS 15310-CLONS 15454 SDH E1-75ONS 15327ONS 15305ONS 15454 M6ONS 15600ONS 15454ONS 15454 SeriesONS 15540 ESPx
Cisco categories
More Cisco categories