Whirlpool Gold WGFM195 manuals
Gold WGFM195
Table of contents
- Table Of Contents
- GAS FURNACE SAFETY PRECAUTIONS
- Electrostatic Discharge (ESD) Precautions
- Component Identification
- LOCATION REQUIREMENTS AND CONSIDERATIONS
- Clearances and Accessibility
- Furnace Suspension
- INSTALLATION POSITIONS
- Alternate Electrical and Gas Line Connections
- Dual Certification: Nondirect/Direct Vent
- Canadian Venting Requirements
- Combustion Air Pipe—Nondirect Vent Installations
- Nondirect Vent (Single Pipe) Piping
- Direct Vent (Dual Pipe) Piping
- Vent/Flue and Combustion Air Pipe Terminations
- Vent/Intake Terminations for Installation of Multiple Direct Vent Furnaces
- Concentric Vent Termination
- Upright Installations—Trap on Left Side
- Upright Drain Trap Mounting—Left or Right Side Panel
- Horizontal Drain Trap Mounting—Left or Right Side Panel
- Junction Box Relocation
- Volt Line Connection of Accessories (Humidifier and Electronic Air Cleaner)
- GAS SUPPLY AND PIPING
- Gas Piping Checks
- CIRCULATING AIR AND FILTERS
- Checking Duct Static
- START-UP PROCEDURE AND ADJUSTMENT
- Gas Manifold Pressure Measurement and Adjustment
- Circulator Blower Speeds
- Heating Mode—Mode DIP Switch Set to 2 STG Position
- SAFETY CIRCUIT DESCRIPTION
- Burners
- Before Leaving an Installation
- Diagnostic Chart
- BLOWER PERFORMANCE DATA
- WIRING DIAGRAM—ALL WGFM195 EXCEPT WGFM195090S5C
- WIRING DIAGRAM—ALL WFD195 AND WGFM195090S5C
- WIRING DIAGRAM—ALL WFM19
- ASSISTANCE OR SERVICE
Gold WGFM195
Table of contents
- Table Of Contents
- GAS FURNACE SAFETY PRECAUTIONS
- Electrostatic Discharge (ESD) Precautions
- Component Identification
- LOCATION REQUIREMENTS AND CONSIDERATIONS
- Clearances and Accessibility
- Existing Furnace Removal
- INSTALLATION POSITIONS
- Alternate Electrical and Gas Line Connections
- PROPANE GAS/HIGH ALTITUDE INSTALLATIONS
- Proper Vent/Flue and Combustion Air Piping Practices
- Standard Furnace Connections
- Alternate Vent/Flue Location
- Nondirect Vent (Single Pipe) Piping
- Direct Vent (Dual Pipe) Piping
- Vent/Flue and Combustion Air Pipe Terminations
- Vent/Intake Terminations for Installation of Multiple Direct Vent Furnaces
- Side Wall Vent Kit
- Upright Installations—Trap on Left Side
- Horizontal Installations—Right Side Down
- Horizontal Drain Trap Mounting—Left or Right Side Panel
- Junction Box Relocation
- GAS SUPPLY AND PIPING
- Gas Control Valve
- Gas Piping Checks
- CIRCULATING AIR AND FILTERS
- START-UP PROCEDURE AND ADJUSTMENT
- Gas Manifold Pressure Measurement and Adjustment
- Gas Input Rate Measurement—Natural Gas Only
- Circulator Blower Speeds
- Cooling Mode
- MAINTENANCE
- Flue Passages (Qualified Servicer Only)
- Diagnostic Chart
- BLOWER PERFORMANCE DATA
- WIRING DIAGRAM—WFD195
- WIRING DIAGRAM—WGFM195
- ASSISTANCE OR SERVICE