OneStart

Mitsubishi Electric Central Controller G-50A manuals

Central Controller G-50A first page preview

Central Controller G-50A

Brand: Mitsubishi Electric | Category: Controller
Table of contents
Central Controller G-50A first page preview

Central Controller G-50A

Brand: Mitsubishi Electric | Category: Controller
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Safety precautions
  4. Outline of product
  5. Function
  6. Centralized monitoring/controlling by Web browser
  7. Centralized control by integrated software TG-2000A
  8. Remote monitoring/controlling - Transmitting of abnormal mail
  9. Comparison table of function
  10. Products list
  11. Specification
  12. System design flow
  13. Step 1 : Selection of air conditioning equipment
  14. Limitation on transmission line wiring
  15. A-control transmission line
  16. Step 2 : Selecting system management parts
  17. Regarding power supply within the system
  18. Selecting the power supply unit
  19. When managing a K-control model
  20. External input/output
  21. External output signal function
  22. Centralized monitoring using a PC
  23. About floors, blocks, and groups
  24. Centralized control PC (local arrangement)
  25. About password control
  26. About LAN
  27. LAN wire length
  28. Step4 : Implementing annual/weekly schedules
  29. Weekly schedule using the G-50A
  30. Weekly schedule of the integrated software
  31. Step 5: Charging Function of Energy Charge Measuring
  32. Selection of Charging Function
  33. Basic Composition and Required Materials
  34. Watt-hour meter pulse counting (apportioning) method
  35. Measuring instrument pulse counting (direct reading) method
  36. Power consumption PC direct reading system (Apportioning system)
  37. Mechanism of Charge Calculation
  38. Apportioning calculation method of outdoor unit
  39. Apportioned calculation of indoor unit
  40. Manual input of electric power consumption
  41. In the case of measuring instrument pulse counting (direct reading) method
  42. Output of Charging Data
  43. Charging Method
  44. Caution for Using Charging Function
  45. Step 6: Energy Saving/Peak Cut Control
  46. Outline
  47. Energy Saving Control/Peak Cut Control
  48. Peak cut control
  49. Current energy saving control Status
  50. Energy Saving Control System Design Flow
  51. Step 7: Selection of Measuring Instruments
  52. Step 8: General Purpose Equipment Control
  53. Determine the control items
  54. PLC assignment
  55. Setting of TG-2000A
  56. Step 9: Determining Number of PLC Units
  57. PLC's for Pulse Count Function
  58. PLC for General-purpose Control Function
  59. Terminal connection diagram
  60. PLC Software
  61. External View of Sequencer
  62. PLC Wiring Diagram
  63. Step 10:Determination of Address for Air Conditioning Instrument and PC for Control
  64. Setting method for connecting G-50A to exclusive LAN
  65. Setting method for connecting G-50A to existing LAN
  66. Setting for Remote Monitoring
  67. Setting of Abnormal Mail Transmission System
  68. Preparations before performing abnormal mail transmission
  69. System Using Optical Cable for LAN
  70. Step 11: Confirmation of Other Functions
  71. User registration from administrator
  72. Trend Data Output Function
  73. Preparation for outputting parameter files
  74. Example of CSV files output
  75. Graphing trend data
  76. Initial Setting Tool
  77. Composition of Initial Setting Tool
  78. Connection to G-50A
  79. Other function
  80. Auto-changeover mode
Related products
Central Controller GB-50AC ControllerEW-50AAE-50AGB-50ADA-AGB-50ADA-JGX Configurator-SCGX Configurator-DAPAC-AH10A-GMELSERVO-J4 MR-J4-500A
Mitsubishi Electric categories
More Mitsubishi Electric categories