OneStart

Cisco CE 2000 Platform SCE 2000 4xGBE manuals

CE 2000 Platform SCE 2000 4xGBE first page preview

CE 2000 Platform SCE 2000 4xGBE

Brand: Cisco | Category: Network Hardware
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. document revision history
  5. related publications
  6. obtaining documentation
  7. documentation feedback
  8. the cisco service control concept
  9. cisco service control capabilities
  10. management and collection
  11. network management
  12. introduction to the sce platform
  13. front panel
  14. Back Panel
  15. Checking the Shipping Container Contents
  16. SCE 2000 Component List
  17. SCE 2000 Installation Checklist
  18. Topology
  19. Functionality
  20. Link Continuity
  21. Physical Topologies
  22. Two Cascaded SCE 2000s For Dual Links
  23. Topology-Related Parameters
  24. physically connected links parameter
  25. Installation and Maintenance
  26. Tools and Parts Required
  27. Site Requirement Guidelines
  28. Installing the SCE 2000 Platform
  29. Installation Precautions
  30. Rack-Mounting a SCE 2000 Platform
  31. attaching the brackets to the sce
  32. attaching the crossrail supports to the rack
  33. mounting the system to the rack
  34. Attaching a Chassis Ground Connection
  35. Power Supply Overview
  36. LEDs
  37. Power Supply Specifications
  38. Powering Down the Power Supply Unit and Disconnecting Input Power
  39. Removing the Power Supply Unit
  40. Replacing the Power Supply Unit
  41. reconnecting ac-input power supply unit
  42. reconnecting dc-input power supply unit
  43. Fan Module Overview
  44. removing the fan module
  45. Replacing the Battery
  46. Connecting the Management Interfaces and Performing Initial System Configuration
  47. Setting Up the Local Console
  48. Initial System Configuration
  49. Index
  50. Step 1: Configuring Initial Settings
  51. Step 2: Configuring the Hostname
  52. Step 4: Configuring Time Settings
  53. Step 5: Configuring the DNS Settings
  54. Step 6: Configuring the RDR Formatter Destination
  55. Step 7: Configuring Access Control Lists (ACLs)
  56. order of entries
  57. Step 8: Configuring SNMP
  58. Step 9: Configuring the Topology-Dependent Parameters
  59. Step 10: Completing and Saving the Configuration
  60. Connecting the Management Interface
  61. Verifying Management Interface Connectivity
  62. Cabling the Line Ports and Completing the Installation
  63. Cabling Diagrams
  64. Configuring the GBE Interface Parameters
  65. Connecting the GBE Line Interface Ports
  66. cabling the gbe port
  67. Testing Connectivity: Examining Link LEDs and Counters
  68. Installing a Cascaded System
  69. CLI Commands
  70. configuring the connection mode
  71. link mode
  72. Loading and Activating a Service Control Application
  73. Basic SCE 2000 Platform Operations
  74. Starting the System and Observing Initial Conditions
  75. Final Tests
  76. Managing SCE 2000 Configurations
  77. Saving the Configuration Settings
  78. Recovering a Previous Configuration
  79. Performing Complex Configurations
  80. Shutting Down the SCE Platform
  81. Troubleshooting
  82. Troubleshooting Tools
  83. CLI Commands for Troubleshooting
  84. The User Log
  85. copying the user log
  86. clearing the user log
  87. Check the LEDs
  88. Problem Solving Using a Subsystems Approach
  89. Troubleshooting the Power Subsystem
  90. Troubleshooting the Firmware Package Installation
  91. Troubleshooting the Management Subsystem
  92. Troubleshooting the Link Interface Subsystem
  93. The External Optical Bypass Module
  94. External Optical Bypass Functionality
  95. The External Optical Bypass Module Front Panel
  96. Installing the Module in a Rack
  97. Specifications
  98. Table Of Contents
  99. Table Of Contents
  100. Table Of Contents
CE 2000 Platform SCE 2000 4xGBE first page preview

CE 2000 Platform SCE 2000 4xGBE

Brand: Cisco | Category: Network Router
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Introduction
  6. related publications
  7. document conventions
  8. obtaining documentation
  9. obtaining additional publications and information
  10. SCE Platform Management Interfaces
  11. sce platform management interfaces
  12. Overview of the SCE 2000 Platform
  13. Service Control Management
  14. Front Panel
  15. Back Panel
  16. Checking the Shipping Container Contents
  17. SCE 2000 Installation Checklist
  18. Topology
  19. Functionality
  20. Link Continuity
  21. Physical Topologies
  22. Two Cascaded SCE 2000s For Dual Links
  23. Topology-Related Parameters
  24. sce 2000 configuration
  25. physically connected links parameter
  26. Installation and Maintenance
  27. Tools and Parts Required
  28. Site Requirement Guidelines
  29. Installing the SCE 2000 Platform
  30. Installation Precautions
  31. Installing the SCE 2000 on a Workbench or Tabletop
  32. Rack-Mounting a SCE 2000 Platform
  33. attaching the brackets to the sce
  34. attaching the crossrail supports to the rack
  35. mounting the system to the rack
  36. Attaching a Chassis Ground Connection
  37. Power Supply Overview
  38. LEDs
  39. Power Supply Specifications
  40. Removing and Replacing a Power Supply Unit
  41. powering down an ac-input power supply
  42. Removing the Power Supply Unit
  43. Reconnecting the Power
  44. reconnecting dc-input power supply unit
  45. Fan Module Overview
  46. removing the fan module
  47. Replacing the Battery
  48. Connecting the Management Interfaces and Performing Initial System Configuration
  49. Setting Up the Local Console
  50. Initial System Configuration
  51. Step 1: Configuring Initial Settings
  52. Step 2: Configuring the Hostname
  53. Step 4: Configuring Time Settings
  54. Step 5: Configuring the DNS Settings
  55. Step 6: Configuring the RDR Formatter Destination
  56. Step 7: Configuring Access Control Lists (ACLs)
  57. order of entries
  58. Step 8: Configuring SNMP
  59. Step 9: Configuring the Topology-Dependent Parameters
  60. Step 10: Completing and Saving the Configuration
  61. Connecting the Management Interface
  62. Cabling the Management Port
  63. Verifying Management Interface Connectivity
  64. Cabling the Line Ports and Completing the Installation
  65. Cabling Diagrams
  66. Configuring the GBE Interface Parameters
  67. Connecting the GBE Line Interface Ports
  68. Testing Connectivity: Examining Link LEDs and Counters
  69. Installing a Cascaded System
  70. CLI Commands
  71. link mode
  72. monitoring the system
  73. Loading and Activating a Service Control Application
  74. Basic SCE 2000 Platform Operations
  75. Starting the System and Observing Initial Conditions
  76. Final Tests
  77. Managing SCE 2000 Configurations
  78. Saving the Configuration Settings
  79. Recovering a Previous Configuration
  80. Performing Complex Configurations
  81. Rebooting and Shutting Down the SCE Platform
  82. Shutting Down the SCE Platform
  83. Troubleshooting
  84. Troubleshooting Tools
  85. the user log
  86. generating a file for technical support
  87. sce 2000 operational status
  88. Problem Solving Using a Subsystems Approach
  89. Troubleshooting the Firmware Package Installation
  90. Troubleshooting the Management Subsystem
  91. Troubleshooting the Link Interface Subsystem
  92. The External Optical Bypass Module
  93. External Optical Bypass Functionality
  94. The External Optical Bypass Module Front Panel
  95. Installing the External Bypass Module
  96. Cabling the External Optical Bypass Module
  97. Specifications
  98. Table Of Contents
  99. Table Of Contents
  100. Table Of Contents
CE 2000 Platform SCE 2000 4xGBE first page preview

CE 2000 Platform SCE 2000 4xGBE

Brand: Cisco | Category: Network Router
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. about this guide
  7. related publications
  8. Information About the Cisco Service Control Concept
  9. Chapter 1 General Overview
  10. The SCE Platform
  11. Information About Management and Collection
  12. Network Management
  13. Service Configuration Management
  14. information about the sce platform
  15. Chapter 2 Introduction to the SCE Platform
  16. Back Panel
  17. sce 2000 installation checklist
  18. SCE 2000 Installation Checklist
  19. The SCE 2000 Platform
  20. Chapter 3 Information About Topology
  21. Bypass Mechanism
  22. Asymmetric Routing Topology
  23. Single Link: Receive-only Topology
  24. Dual Link: Receive-Only Topology
  25. Information About Two Cascaded SCE 2000s For Dual Links
  26. Information About Topology-Related Parameters
  27. Physically Connected Links Parameter
  28. Information About Preparing to Install the SCE 2000 Platform
  29. C H A P T E R 4 Installation and Maintenance
  30. Information About Site Requirement Guidelines
  31. Installing the SCE 2000 Platform
  32. Installation Precautions
  33. Rack-Mounting a SCE 2000 Platform
  34. How to Attach the Brackets to the SCE 2000
  35. How to Attach the Crossrail Supports to the Rack
  36. How to Mount the System to the Rack
  37. How to Attach a Chassis Ground Connection
  38. Removing and Replacing a Power Supply Unit
  39. LEDs
  40. Power Supply Specifications
  41. How to Power Down a DC-Input Power Supply Unit and Remove the DC-Input Leads
  42. How to Remove the Power Supply Unit
  43. Reconnecting the Power
  44. How to Reconnect DC-Input Power Supply Unit
  45. Fan Module Overview
  46. Removing and Replacing the Fan Module
  47. Replacing the Fan Module
  48. How to Replace the Battery
  49. How to Set Up the Local Console
  50. C H A P T E R 5 Connecting the Management Interfaces and Performing Initial System Configuration
  51. Setup Command Parameters
  52. Step 1: How to Configure Initial Settings
  53. Step 2: How to Configure the Hostname
  54. Step 4: How to Configure Time Settings
  55. Step 5: How to Configure the DNS Settings
  56. Step 6: How to Configure the RDR Formatter Destination
  57. How to Configure Access Control Lists (ACLs)
  58. Step 8: How to Configure SNMP
  59. Step 9: How to Configure the Topology-Dependent Parameters
  60. Step 10: How to Complete and Save the Configuration
  61. Connecting the Management Interface
  62. How to Verify Management Interface Connectivity
  63. Connecting the line ports to the network
  64. Single Link: Inline Topology
  65. C H A P T E R 6 Cabling the Line Ports and Completing the Installation
  66. Dual Link: Two SCE 2000s Topology
  67. How to Configure the GBE Interface Parameters
  68. Fiber Specifications
  69. the Device
  70. How to View the Gigabit Ethernet Counters
  71. Information About Cascaded Systems
  72. CLI Commands for Cascaded Systems
  73. How to Configure the Connection Mode
  74. Monitoring the System
  75. How to Load and Activate a Service Control Application
  76. Starting the SCE 2000 Platform
  77. Chapter 7 Basic SCE 2000 Platform Operation
  78. Final Tests
  79. How to View the User Log Counters
  80. How to Save or Change the Configuration Settings
  81. Example for Saving or Changing the Configuration Settings
  82. How to Recover a Previous Configuration
  83. How to Display the SCE Platform Version Information
  84. How to Display the SCE Platform Inventory
  85. Rebooting and Shutting Down the SCE Platform
  86. Examples for Shutting Down the SCE Platform
  87. Troubleshooting Overview
  88. Chapter 8 Troubleshooting
  89. Checking the LEDs
  90. Problem Solving Using a Subsystems Approach
  91. Troubleshooting the Power Subsystem
  92. Troubleshooting the Firmware Package Installation
  93. Troubleshooting the Management Subsystem
  94. Troubleshooting the Link Interface Subsystem
  95. Troubleshooting with the User Log
  96. How to Copy the User Log to an Internal Location
  97. How to View the Non-volatile Logger Counters For Both the User Log File and the Debug Log File
  98. The External Optical Bypass Module
  99. External Optical Bypass Functionality
  100. Specifications
  101. How to Cable the External Optical Bypass Module
Related products
SCE 1000 and
Cisco categories
More Cisco categories