Cisco CE 2000 Platform SCE 2000 4xGBE manuals
CE 2000 Platform SCE 2000 4xGBE
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- document revision history
- related publications
- obtaining documentation
- documentation feedback
- the cisco service control concept
- cisco service control capabilities
- management and collection
- network management
- introduction to the sce platform
- front panel
- Back Panel
- Checking the Shipping Container Contents
- SCE 2000 Component List
- SCE 2000 Installation Checklist
- Topology
- Functionality
- Link Continuity
- Physical Topologies
- Two Cascaded SCE 2000s For Dual Links
- Topology-Related Parameters
- physically connected links parameter
- Installation and Maintenance
- Tools and Parts Required
- Site Requirement Guidelines
- Installing the SCE 2000 Platform
- Installation Precautions
- Rack-Mounting a SCE 2000 Platform
- attaching the brackets to the sce
- attaching the crossrail supports to the rack
- mounting the system to the rack
- Attaching a Chassis Ground Connection
- Power Supply Overview
- LEDs
- Power Supply Specifications
- Powering Down the Power Supply Unit and Disconnecting Input Power
- Removing the Power Supply Unit
- Replacing the Power Supply Unit
- reconnecting ac-input power supply unit
- reconnecting dc-input power supply unit
- Fan Module Overview
- removing the fan module
- Replacing the Battery
- Connecting the Management Interfaces and Performing Initial System Configuration
- Setting Up the Local Console
- Initial System Configuration
- Index
- Step 1: Configuring Initial Settings
- Step 2: Configuring the Hostname
- Step 4: Configuring Time Settings
- Step 5: Configuring the DNS Settings
- Step 6: Configuring the RDR Formatter Destination
- Step 7: Configuring Access Control Lists (ACLs)
- order of entries
- Step 8: Configuring SNMP
- Step 9: Configuring the Topology-Dependent Parameters
- Step 10: Completing and Saving the Configuration
- Connecting the Management Interface
- Verifying Management Interface Connectivity
- Cabling the Line Ports and Completing the Installation
- Cabling Diagrams
- Configuring the GBE Interface Parameters
- Connecting the GBE Line Interface Ports
- cabling the gbe port
- Testing Connectivity: Examining Link LEDs and Counters
- Installing a Cascaded System
- CLI Commands
- configuring the connection mode
- link mode
- Loading and Activating a Service Control Application
- Basic SCE 2000 Platform Operations
- Starting the System and Observing Initial Conditions
- Final Tests
- Managing SCE 2000 Configurations
- Saving the Configuration Settings
- Recovering a Previous Configuration
- Performing Complex Configurations
- Shutting Down the SCE Platform
- Troubleshooting
- Troubleshooting Tools
- CLI Commands for Troubleshooting
- The User Log
- copying the user log
- clearing the user log
- Check the LEDs
- Problem Solving Using a Subsystems Approach
- Troubleshooting the Power Subsystem
- Troubleshooting the Firmware Package Installation
- Troubleshooting the Management Subsystem
- Troubleshooting the Link Interface Subsystem
- The External Optical Bypass Module
- External Optical Bypass Functionality
- The External Optical Bypass Module Front Panel
- Installing the Module in a Rack
- Specifications
- Table Of Contents
- Table Of Contents
- Table Of Contents
CE 2000 Platform SCE 2000 4xGBE
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Introduction
- related publications
- document conventions
- obtaining documentation
- obtaining additional publications and information
- SCE Platform Management Interfaces
- sce platform management interfaces
- Overview of the SCE 2000 Platform
- Service Control Management
- Front Panel
- Back Panel
- Checking the Shipping Container Contents
- SCE 2000 Installation Checklist
- Topology
- Functionality
- Link Continuity
- Physical Topologies
- Two Cascaded SCE 2000s For Dual Links
- Topology-Related Parameters
- sce 2000 configuration
- physically connected links parameter
- Installation and Maintenance
- Tools and Parts Required
- Site Requirement Guidelines
- Installing the SCE 2000 Platform
- Installation Precautions
- Installing the SCE 2000 on a Workbench or Tabletop
- Rack-Mounting a SCE 2000 Platform
- attaching the brackets to the sce
- attaching the crossrail supports to the rack
- mounting the system to the rack
- Attaching a Chassis Ground Connection
- Power Supply Overview
- LEDs
- Power Supply Specifications
- Removing and Replacing a Power Supply Unit
- powering down an ac-input power supply
- Removing the Power Supply Unit
- Reconnecting the Power
- reconnecting dc-input power supply unit
- Fan Module Overview
- removing the fan module
- Replacing the Battery
- Connecting the Management Interfaces and Performing Initial System Configuration
- Setting Up the Local Console
- Initial System Configuration
- Step 1: Configuring Initial Settings
- Step 2: Configuring the Hostname
- Step 4: Configuring Time Settings
- Step 5: Configuring the DNS Settings
- Step 6: Configuring the RDR Formatter Destination
- Step 7: Configuring Access Control Lists (ACLs)
- order of entries
- Step 8: Configuring SNMP
- Step 9: Configuring the Topology-Dependent Parameters
- Step 10: Completing and Saving the Configuration
- Connecting the Management Interface
- Cabling the Management Port
- Verifying Management Interface Connectivity
- Cabling the Line Ports and Completing the Installation
- Cabling Diagrams
- Configuring the GBE Interface Parameters
- Connecting the GBE Line Interface Ports
- Testing Connectivity: Examining Link LEDs and Counters
- Installing a Cascaded System
- CLI Commands
- link mode
- monitoring the system
- Loading and Activating a Service Control Application
- Basic SCE 2000 Platform Operations
- Starting the System and Observing Initial Conditions
- Final Tests
- Managing SCE 2000 Configurations
- Saving the Configuration Settings
- Recovering a Previous Configuration
- Performing Complex Configurations
- Rebooting and Shutting Down the SCE Platform
- Shutting Down the SCE Platform
- Troubleshooting
- Troubleshooting Tools
- the user log
- generating a file for technical support
- sce 2000 operational status
- Problem Solving Using a Subsystems Approach
- Troubleshooting the Firmware Package Installation
- Troubleshooting the Management Subsystem
- Troubleshooting the Link Interface Subsystem
- The External Optical Bypass Module
- External Optical Bypass Functionality
- The External Optical Bypass Module Front Panel
- Installing the External Bypass Module
- Cabling the External Optical Bypass Module
- Specifications
- Table Of Contents
- Table Of Contents
- Table Of Contents
CE 2000 Platform SCE 2000 4xGBE
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- about this guide
- related publications
- Information About the Cisco Service Control Concept
- Chapter 1 General Overview
- The SCE Platform
- Information About Management and Collection
- Network Management
- Service Configuration Management
- information about the sce platform
- Chapter 2 Introduction to the SCE Platform
- Back Panel
- sce 2000 installation checklist
- SCE 2000 Installation Checklist
- The SCE 2000 Platform
- Chapter 3 Information About Topology
- Bypass Mechanism
- Asymmetric Routing Topology
- Single Link: Receive-only Topology
- Dual Link: Receive-Only Topology
- Information About Two Cascaded SCE 2000s For Dual Links
- Information About Topology-Related Parameters
- Physically Connected Links Parameter
- Information About Preparing to Install the SCE 2000 Platform
- C H A P T E R 4 Installation and Maintenance
- Information About Site Requirement Guidelines
- Installing the SCE 2000 Platform
- Installation Precautions
- Rack-Mounting a SCE 2000 Platform
- How to Attach the Brackets to the SCE 2000
- How to Attach the Crossrail Supports to the Rack
- How to Mount the System to the Rack
- How to Attach a Chassis Ground Connection
- Removing and Replacing a Power Supply Unit
- LEDs
- Power Supply Specifications
- How to Power Down a DC-Input Power Supply Unit and Remove the DC-Input Leads
- How to Remove the Power Supply Unit
- Reconnecting the Power
- How to Reconnect DC-Input Power Supply Unit
- Fan Module Overview
- Removing and Replacing the Fan Module
- Replacing the Fan Module
- How to Replace the Battery
- How to Set Up the Local Console
- C H A P T E R 5 Connecting the Management Interfaces and Performing Initial System Configuration
- Setup Command Parameters
- Step 1: How to Configure Initial Settings
- Step 2: How to Configure the Hostname
- Step 4: How to Configure Time Settings
- Step 5: How to Configure the DNS Settings
- Step 6: How to Configure the RDR Formatter Destination
- How to Configure Access Control Lists (ACLs)
- Step 8: How to Configure SNMP
- Step 9: How to Configure the Topology-Dependent Parameters
- Step 10: How to Complete and Save the Configuration
- Connecting the Management Interface
- How to Verify Management Interface Connectivity
- Connecting the line ports to the network
- Single Link: Inline Topology
- C H A P T E R 6 Cabling the Line Ports and Completing the Installation
- Dual Link: Two SCE 2000s Topology
- How to Configure the GBE Interface Parameters
- Fiber Specifications
- the Device
- How to View the Gigabit Ethernet Counters
- Information About Cascaded Systems
- CLI Commands for Cascaded Systems
- How to Configure the Connection Mode
- Monitoring the System
- How to Load and Activate a Service Control Application
- Starting the SCE 2000 Platform
- Chapter 7 Basic SCE 2000 Platform Operation
- Final Tests
- How to View the User Log Counters
- How to Save or Change the Configuration Settings
- Example for Saving or Changing the Configuration Settings
- How to Recover a Previous Configuration
- How to Display the SCE Platform Version Information
- How to Display the SCE Platform Inventory
- Rebooting and Shutting Down the SCE Platform
- Examples for Shutting Down the SCE Platform
- Troubleshooting Overview
- Chapter 8 Troubleshooting
- Checking the LEDs
- Problem Solving Using a Subsystems Approach
- Troubleshooting the Power Subsystem
- Troubleshooting the Firmware Package Installation
- Troubleshooting the Management Subsystem
- Troubleshooting the Link Interface Subsystem
- Troubleshooting with the User Log
- How to Copy the User Log to an Internal Location
- How to View the Non-volatile Logger Counters For Both the User Log File and the Debug Log File
- The External Optical Bypass Module
- External Optical Bypass Functionality
- Specifications
- How to Cable the External Optical Bypass Module
CE 2000 Platform SCE 2000 4xGBE
Table of contents