Acer Altos G700 series manuals
Altos G700 series
Table of contents
- fcc notice
- laser compliance statement
- important safety instructions
- Table Of Contents
- Table Of Contents
- Table Of Contents
- System tour
- Features summary
- External and internal structure
- Front panel
- Rear panel
- Internal components
- System boards
- Hot-swap HDD Cage layout
- System setup
- Setting up the system
- Connecting peripherals
- Connecting the PS/2 mouse
- Connecting the VGA monitor
- Connecting a printer
- Connecting the power cable
- Turning on the system
- Power-on problems
- Operating system configuration
- Network connection
- Tower-to-rack option
- Turning off the system
- Upgrading the system
- Installation precautions
- Opening the server
- Removing the side panel
- Removing the air baffle
- Configuring the hot-swappable cage
- hard disk carrier
- Installing the hot-swappable cage
- Installing and removing storage devices
- Installing a 5.25-inch storage device (optional)
- Upgrading the CPU
- To install a CPU with heatsink
- Upgrading the system memory
- To install a DIMM
- Installing an expansion card
- Installing a redundant power supply module
- To install a redundant power supply module
- Installing a hot-swappable HDD fan
- To install a hot-swappable HDD fan
- BIOS setup
- Entering BIOS setup
- Main
- System Information
- Advanced
- Super I/O Configuration
- IDE Configuration
- Floppy Configuration
- PCI/PnP Configuration
- Boot Settings Configuration
- Event Log Configuration
- Onboard Devices Configuration
- Remote Access
- Power
- Boot
- Boot Device Priority
- Hard Disk Drives
- Removable Devices
- ATAPI CD-ROM Drives
- Security
- To set a Supervisor/User password
- Exit
- ASM & RDM quick installation guide
- Installing ASM
- installing asm console
- Installing RDM
- Appendix B Rack installation guide
- System rack installation
- Vertical mounting hole pattern
- Screw types for rack installation
- Installing cage nuts
- Installing the system into the rack
- Index
- Table Of Contents
Altos G700 series
Table of contents
- fcc notice
- laser compliance statement
- important safety instructions
- Table Of Contents
- Table Of Contents
- Table Of Contents
- System tour
- Features summary
- External and internal structure
- Front panel
- system tour
- Rear panel
- Internal components
- System boards
- bpl4 board layout
- System setup
- Setting up the system
- Connecting peripherals
- Connecting the PS/2 mouse
- Connecting the VGA monitor
- Connecting a printer
- Connecting the power cable
- Turning on the system
- Power-on problems
- Operating system configuration
- Network connection
- Tower-to-rack option
- Turning off the system
- Upgrading the system
- Installation precautions
- Opening the server
- Removing the side panel
- Removing the air baffle
- Configuring the hot-swappable BPL4 cage
- Installing a hard disk into the BPL4 cage hard disk carrier
- Installing the BPL4 cage
- Configuring the SCSI cable cage
- Installing a hard disk into the SCSI cable cage
- Installing the SCSI cable cage
- Installing and removing storage devices
- Installing a 5.25-inch storage device (optional)
- Upgrading the CPU
- To install a CPU with heatsink
- Upgrading the system memory
- To install a DIMM
- reconfiguring the system memory
- Installing an expansion card
- Installing a redundant power supply module
- To install a redundant power supply module
- Installing a hot-swappable HDD fan
- To install a hot-swappable HDD fan
- BIOS setup
- Entering BIOS setup
- Main
- Advanced
- Super I/O Configuration
- IDE Configuration
- Floppy Configuration
- PCI/PnP Configuration
- Boot Settings Configuration
- Event Log Configuration
- Onboard Devices Configuration
- Power
- Boot
- Hard Disk Drives
- Removable Devices
- ATAPI CD-ROM Devices
- Security
- To set a Supervisor/User password
- Exit
- Appendix A
- Installing ASM
- installing asm agent
- Installing RDM
- Index
- Table Of Contents