red lion DAS00PN1EE200000 Installation Manual
DA_Dual Ethernet - ADrawing No. LP1112Effective 07 2020DA Dual Ethernet SledInstallation Guide1PACKAGE CHECKLISTThis product package should contain the items listed below. Ifany items are missing or damaged, contact Red Lion immediately.- DA Dual Ethernet Sled- Installation GuideSAFETY SUMMARYAll safety related regulations, local codes as well as instructionsthat appear in this document or on equipment must be observedto ensure personal safety and to prevent damage to either thedevice or equipment connected to it.Do not use these products to replace proper safety interlocking.No software-based device (or any other solid-state device) shouldever be designed to be responsible for the maintenance ofpersonnel safety or consequential equipment not equipped withsafeguards. Red Lion disclaims any responsibility for damages,either direct or consequential, that result from the use of thisequipment in a manner not consistent with these specifications.SPECIFICATIONS1. POWER REQUIREMENTS: Power is supplied by the DA hostcontroller.Max Power: 2.1 W2. INTERFACES:Two 10/100 BaseTX RJ-45 Ports, auto MDI/ MDI-X.Individual isolation from Ethernet network to controller:1500 Vrms3. ENVIRONMENTAL CONDITIONS:Operating Temperature Range: -40 to 75 °CStorage Temperature Range: -40 to 80 °CVibration to IEC 60068-2-6: Operational 5-500 Hz, 2 gShock to IEC 60068-2-27: Operational 15 gOperating and Storage Humidity: 0 to 95% max. RH non-condensingAltitude: Up to 2000 meters4. CERTIFICATIONS AND COMPLIANCES:Refer to the controller manual for agency certifications.CE ApprovedEN 61326-1 Immunity to Industrial LocationsEmission CISPR 11 Class AIEC/EN 61010-1RoHS Compliant5. INSTALLATION REQUIREMENTS: Sled must be installedinside the unit case with the hardware provided. See“Installing the Dual Ethernet Sled” for more details.6. WEIGHT: 7.05 oz (200 g)INSTALLING THE DUAL ETHERNET SLEDDA50 INSTALLATION1. Prior to installing the Sled for your DA50 application, ensurethat the unit is not receiving power.2. Disconnect and remove your DA50 from the DIN rail.3. Remove the DA50 unit’s front cap by squeezing the sides andpulling.4. Slide out the sled holder.5. Install the sled into the sled holder and hand tighten thecaptive fasteners, or use a screwdriver.6. Re-install the sled holder containing the sled into theConverter. Make sure it is fully seated.7. Replace the front cap.CAUTION: Risk of DangerRead complete instructions prior to installation andoperation of the unit.ATTENTION : Risque de dangerLire les instructions complètes avant l’installation etl’utilisation de l’appareil.CAUTION: Follow standard ESD precautionaryprocedures.ATTENTION: Suivez les procédures de précautionstandard de décharge électrostatique.WARNING - Disconnect all power to the unit beforeinstalling or removing sleds.AVERTISSEMENT - Débranchez l’alimentation électriquede l’appareil avant d’installer ou de retirer les tiroirs.z Dual 10/100TX Ethernet communicationz Industrial rated for harsh environmentsz Wide operating temperature rangez Simplified deployment architecturez Field installablez Individually isolated portsFor use with DA50 and DA70 series covered in DEMKO 20 ATEX2268X and IECEx UL 20.0007X certificates |
Related manuals for red lion DAS00PN1EE200000
This manual is suitable for:
Product
Menu
Learn More
Menu
Legal
Menu
Copyright © 2024 OneStart. All Rights Reserved