Toshiba BMS-TP0640ACE Manual
985-1 Trial operationPreparationEntering namesChecks before trialoperation (controlwiring)Trial operationstartupItem DescriptionPreparation of necessarydocumentsEntry of setting conditionsChecking installation workChecking control wiringusing the before-trialoperation check list.Checking block/tenant/areanamesChecking schedulesPower onInitial screenSystem initializationCheck point● Meeting with the customer on setting informationCreation of control wiring system diagramCreation of air conditioner address tableCreation of schedule table for each R.C. group/indoor● Create a setting file including setting data.● Set the setting data in the Touch Screen Controller byoverwriting (copy) the data on its CF (Compact Flash) card.● Power supply wiring● Control wiring● Grounding of units● Check control wiring specifications and wire sizes.● Check block/tenant/area names using the air conditioneraddress table.● Check schedules using the schedule table for each R.C.group/indoor.● Turn on the Touch Screen Controller with the IntelligentServer and the relay interface turned on.● The controller software starts automatically, and the totalbuilding control screen appears.● Select “System Initialize” from the option to initialize thesystem.When “System Initialize” is selected, a message “Will youre-cold start all intelligent server?” appears. Select “Yes”.The setting file is transmitted from the Intelligent Server tothe relay interface.The L1 or L2 LED of the Intelligent Server blinks during thestartup process. When the startup processing endssuccessfully, the L1 and L2 LEDs turn off. If the startupprocessing fails, the L1 LED lights up. Retry “SystemInitialize” from the Touch Screen Controller in this case. Orselect “TPC-CON” on the hidden Windows task bar at thebottom of the LCD screen. You can see a message on thescreen during the system reset. The “Access Start”message appears at the end of several message lines. Ittakes several minutes for system initialization.Trial operation Checking communicationstatus (referring to thecontrol wiring systemdiagram)Checking operation statususing the before-trialoperation check list.● Select air conditioning screen after System Initialize to checkcommunication status and connection of air conditioners.Check that there is no orange frame on the command buttonof the air conditioner, which indicates a communicationerror. If an orange frame is present, check power on (or off),control line wiring, and address setting of the air conditioner.● Check operation status for each block, tenant, area, andR.C. group/indoor.- ON/OFF- Operation mode- Set temperaturesCheck all indoor units whether controls can be changed fromthe Touch Screen Controller and whether the settingchanged by the remote controller is reflected on the TouchScreen Controller on both the Touch Screen Controller sideand the on-site remote controller side. |
This manual is suitable for:
Product
Menu
Learn More
Menu
Legal
Menu
Copyright © 2024 OneStart. All Rights Reserved