OneStart

Siemens 1LA8 Operating Instructions Manual Manual pdf 1 page image

Siemens 1LA8 Operating Instructions Manual

Also see for 1LA8: Operating instructionsOperating & installation instructionsOperating instructions

Page 1 previewPage 2 previewPage 3 previewPage 4 previewPage 5 previewPage 6 previewPage 7 previewPage 8 previewPage 9 previewPage 10 previewPage 11 previewPage 12 previewPage 13 previewPage 14 previewPage 15 previewPage 16 previewPage 17 previewPage 18 previewPage 19 previewPage 20 previewPage 21 previewPage 22 previewPage 23 previewPage 24 previewPage 25 previewPage 26 previewPage 27 previewPage 28 previewPage 29 previewPage 30 previewPage 31 previewPage 32 previewPage 33 previewPage 34 previewPage 35 previewPage 36 previewPage 37 previewPage 38 previewPage 39 previewPage 40 previewPage 41 previewPage 42 previewPage 43 previewPage 44 previewPage 45 previewPage 46 previewPage 47 previewPage 48 previewPage 49 previewPage 50 previewPage 51 previewPage 52 previewPage 53 previewPage 54 previewPage 55 previewPage 56 previewPage 57 previewPage 58 previewPage 59 previewPage 60 previewPage 61 previewPage 62 previewPage 63 previewPage 64 previewPage 65 previewPage 66 previewPage 67 previewPage 68 previewPage 69 previewPage 70 previewPage 71 previewPage 72 previewPage 73 previewPage 74 previewPage 75 previewPage 76 previewPage 77 previewPage 78 previewPage 79 previewPage 80 previewPage 81 previewPage 82 previewPage 83 previewPage 84 previewPage 85 previewPage 86 previewPage 87 previewPage 88 previewPage 89 previewPage 90 previewPage 91 previewPage 92 previewPage 93 previewPage 94 previewPage 95 previewPage 96 previewPage 97 previewPage 98 previewPage 99 previewPage 100 previewPage 101 previewPage 102 previewPage 103 previewPage 104 previewPage 105 previewPage 106 previewPage 107 previewPage 108 previewPage 109 previewPage 110 previewPage 111 previewPage 112 previewPage 113 previewPage 114 previewPage 115 previewPage 116 previewPage 117 previewPage 118 previewPage 119 previewPage 120 previewPage 121 previewPage 122 previewPage 123 previewPage 124 previewPage 125 previewPage 126 previewPage 127 previewPage 128 previewPage 129 previewPage 130 previewPage 131 previewPage 132 previewPage 133 previewPage 134 previewPage 135 previewPage 136 previewPage 137 previewPage 138 previewPage 139 previewPage 140 previewPage 141 previewPage 142 previewPage 143 previewPage 144 previewPage 145 previewPage 146 previewPage 147 previewPage 148 preview
Contents
  1. Table Of Contents
  2. Assembly
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. Introduction
  11. safety information
  12. Qualified personnel
  13. Electrostatic sensitive devices
  14. Electromagnetic compatibility
  15. Interference voltages when operating the converter
  16. Description
  17. rating plate
  18. Preparations for use
  19. Noise emissions
  20. Space requirements
  21. transport and storage
  22. Checking the delivery
  23. Securing the rotor
  24. Transporting the machine set
  25. Storage
  26. Protection against corrosion
  27. Converter operation
  28. Insulated bearings when operating the converter
  29. Preparations for installation
  30. Insulation resistance and polarization index
  31. Preparing the mating faces
  32. Checking the load handling attachments
  33. Removing anti-corrosion protection
  34. Mounting the output elements
  35. Lifting and transporting the machine
  36. Draining condensation
  37. Putting the machine down
  38. Installing the machine
  39. Preconditions for smooth, vibration-free operation
  40. Image 5-3 Schematic diagram: Aligning the machine to the driven machine
  41. Aligning the machine to the driven machine and attaching it to it (IM B5)
  42. Axial and radial forces
  43. electrical connection
  44. Terminal box GT640
  45. Terminal box 1XB1631
  46. Terminal box 1XB1634
  47. Terminal box 1XB9600
  48. Terminal designation
  49. Radio-frequency grounding for converter operation
  50. Connection without terminal box
  51. Connecting the machine for a specific direction of rotation
  52. Inserting the cable into the GT640 terminal box
  53. Inserting the cable into the 1XB.. terminal box with ring seal
  54. Laying cables
  55. Connecting cables with cable lugs
  56. Image 6-9 Connection using terminal clamps (schematic diagram)
  57. Use of aluminum conductors
  58. Stepless mating face for sealing in the terminal box cover (not for GT640)
  59. Finishing connection work
  60. Connecting temperature monitoring for the stator winding
  61. Terminating the connection work (auxiliary circuit)
  62. Maximum peak voltage at the motor terminals
  63. Converter operation on a grounded network
  64. Checks to be carried out prior to commissioning
  65. Measuring the insulation resistance before commissioning
  66. Greasing the roller bearings prior to commissioning
  67. Setpoint values for monitoring the bearing temperature
  68. test run
  69. De-energizing
  70. Safety guidelines in operation
  71. Switching off the anti-condensation heating
  72. Switching on the machine
  73. Avoidance of condensation or formation of condensation within the machine
  74. Shaft grounding brushes (option)
  75. Decommissioning the machine
  76. Electrical faults
  77. Mechanical faults
  78. Roller bearing faults
  79. inspection and maintenance
  80. maintenance work
  81. Inspections in the event of faults
  82. general inspection
  83. Regreasing intervals and types of grease for operating roller bearings
  84. Sealing the rolling-contact bearings ("Increased degree of protection" option)
  85. Keeping the cooling air flow clean
  86. Corrective Maintenance
  87. Seal the motor
  88. External fan made of metal
  89. External fan made of plastic
  90. Roller-contact bearings
  91. Remove V ring
  92. Assembling the rolling-contact bearings
  93. Install the V ring
  94. Installing the V ring ("Increased degree of protection" option)
  95. Installing the labyrinth sealing ring
  96. Image 9-7 Position the set screws for the labyrinth sealing ring on the outer bearing cover
  97. spare parts
  98. Anti-condensation heating
  99. Stator and rotor
  100. Ventilation
  101. Drive end rolling-contact bearings with bearing housing
  102. Drive end rolling-contact bearings without bearing housing
  103. Roller bearings, DE - end shield with integrated bearing cover
  104. Non-drive end rolling-contact bearings with bearing housing
  105. Non-drive end rolling-contact bearings without bearing housing
  106. Roller bearings, NDE - end shield with integrated bearing cover
  107. Terminal box 1XB1621
  108. Table 10-11 Additional spare parts
  109. Disposal
  110. Disposal of components
  111. B.1 Tightening torques for screw and bolt connections
  112. Index
/ 148
Related manuals for Siemens 1LA8
Siemens 1LA8 Operating Instructions Manual first page preview
Siemens 1LA8 Operating Instructions Manual
Siemens 1LA Operating Instructions Manual first page preview
Siemens 1LA Operating Instructions Manual
Siemens 1LA8 Operating & Installation Instructions Manual first page preview
Siemens 1LA8 Operating & Installation Instructions Manual
Siemens 1LA8 Series Operating Instructions Manual first page preview
Siemens 1LA8 Series Operating Instructions Manual
Siemens 1FT7 Operating Instructions Manual first page preview
Siemens 1FT7 Operating Instructions Manual
Siemens AH 180 Operating Instructions Manual first page preview
Siemens AH 180 Operating Instructions Manual
Siemens 1PH728 Operating Instructions Manual first page preview
Siemens 1PH728 Operating Instructions Manual
Siemens 1FP1/3 Operating Instructions Manual first page preview
Siemens 1FP1/3 Operating Instructions Manual
Siemens 1PH818 Operating Instructions Manual first page preview
Siemens 1PH818 Operating Instructions Manual
Siemens 1PH728 Operating Instructions Manual first page preview
Siemens 1PH728 Operating Instructions Manual
This manual is suitable for:
1LA8SIMOTICS TN 1PQ8SIMOTICS TN Series