26Gas Conversion■ Be careful, the operations and adjustments to be carried out when convertingfrom one gas to another.■ All work must be carried out by a qualified technician.■ Before you begin, turn off the gas and electricity supply to the appliance.Change the injector of the burners.1 Remove the pan support, Burner lid and Flame spreader.Unscrew the injector using a 7mm box spanner and replace it withthe stipulated injector for new gas supply. ( see table 1. Page 27.)Carefully reassemble the all components.After injectors are replaced, it is advisable to strongly tighten theinjector in place.Adjusting of the taps of the cooking hob burners forreduced consumption2 ➀ Turn the taps down to minimum.➁ Remove the control handles from taps.➂ Adjusting the by-pass screw.- For converting G20 into G30 or G31, the screw mustbe screwed down fully tight.- At this stage, light up the burners and turn thecontrol handles from max position to minimumposition to check flame stability.- For converting G30 or G31 into G20, please contact“After-Sales Service”.➃ Replace the control handles on the taps.InjectorControl handleTapSealing ringTapby-pass screw■ Do not dismantle the tap shaft : in the event of a malfunction, change the whole tap.■ Before placing the burners back on the top place, make sure that the injector isnot blocked.■ A full operational test and a test for possible leakages must be carried out aftergas conversion. (such as soap water or gas detector)■ After completing conversion, a qualified technician or installer has to mark “V”on the right gas categoryto match with the settingin rating plate.Remove the previoussetting “V” mark.ELECTRONICSGN642JDXD1 S/N: V1PT79MC300001G20/20mbar 220-240V 50/60Hz∑Qn Q20:8.3kW G30:591g/h G31:570g/hG20-20mbar G30/29mbar G31/37mbar GB Cat.: ll 2H3+006327Burner FeaturesNominal heat input and flow rates see below at 15˚C at 1,013 mbar. (Table 1)COUN-TRYTYPE OFGASBURNER Triple-Crown Rapid Semi-rapid AuxiliaryTotalPOSITION Max Min Max Min Max Min Max MinGB,ITFR,HUBE,LTNL,PTES,CZSKG-30BUTANE29 mbarInjector make(1/100 mm) 98 85 65 50 -Nominal heat input(Kw) 3.8 2.7 3.0 0.75 1.75 0.43 1.0 0.37 11.3Nominal flow rates(L/h) 267 193 211 53 120 31 71 25PLG-30BUTANE36 mbarInjector make(1/100 mm) 93 80 62 47 -Nominal heat input(Kw) 3.8 2.7 3.0 0.85 1.75 0.48 1.0 0.38 11.3Nominal flow rates(L/h) 259 185 203 58 125 33 71 25GB,ITFR,BELT,PTES,CZSKG-31PROPANE37 mbarInjector make(1/100 mm) 98 85 65 50 -Nominal heat input(Kw) 3.8 2.5 3.0 0.7 1.75 0.4 1.0 0.33 11.3Nominal flow rates(L/h) 254 177 199 49 118 28 68 23GB,ITFR,BELT,PTPL,ESCZ,SKG-20NATURAL20 mbarInjector make(1/100 mm) 135 119 97 72 -Nominal heat rating(Kw) 3.8 1.4 3.0 0.78 1.75 0.51 1.0 0.29 11.3Nominal flow rates(L/h) 361 129 271 79 166 54 91 30HUG-20NATURAL25 mbarInjector make(1/100 mm) 128 110 91 68 -Nominal heat input(Kw) 3.8 1.4 3.0 0.84 1.75 0.57 1.0 0.32 11.3Nominal flow rates(L/h) 350 129 271 79 166 54 91 30Burner Calibrated orifice 1/100mmAuxiliary 31Semi-rapid 34Rapid 45Triple-Crown 65- Aeration adjustment none