3137. Sterilization Initial setting: 65°C 10minSet timer to perform sterilization.1 Set operating day & time. (Weekly timer format)2 Sterilization temp (55~65°C)3 Operation time (Time to run sterilization when it reached setting temp5min ~ 60min)User shall set whether to use or not to use sterilization mode.3-5. Service Setup38. Pump maximum speed Initial setting: Depend on model Service setup 12:00am,MonFlow rate Max. Duty Operation88:8 L/min 0xCE Air PurgeSelectNormally setting is not necessary.Please adjust when need to reduce the pump sound etc.Besides that, it has Air Purge function.When *Pump flow setting is Max. Duty, this duty set is the fi x pump duty runduring room side operation.39. Dry concrete30°C1 2 3 4 5 635°C 35°C40°C 40°C45°CStageOperate concrete curing operation.Select Edit, set temp for every stage (1~99 1 is for 1 day).Setting range is 25~55°CWhen it is turned ON, dry concrete starts.When it is 2 zone, it dries both zones.40. Service contact Contact-1: Bryan AdamsABC/ abc 0-9/ OtherA B C D E F G H I J K L M N O P Q RS T U V W X Y Z a b c d e f g h ij k l m n o p q r s t u v w x y zSelect EnterService setup 12:00am,MonService contact:Contact 1Contact 2Select Confi rmAble to set name & tel no. of contactperson when there is breakdownetc. or client has trouble. (2 items)3-6. Remote control setup41. RC selection Initial setting : Single RC selection 12:00am,MonSingleDualSelect ConfirmSet to "Single" when only one remote controller is installed.Set to "Dual" when two remote controllers are installed.