38 PAW-VP•LDHW - Technical Manual – 2019-11Important Peak Cut Settings22.1.2 Details of peak cut settingsTime zone to reduce the operation capacityLargeOperationcapacitySmallPeak cut must be set to 70% or 60%.Peak cut Compressor HZ Heating up time SCOP70 % 45 Hz less than max Hz 173 3.960 % 55 Hz less than max Hz 208 4.1Capacity Performance Data with peak cut 70 % set point TA 46°C U-250PZH2E8/PAW-VP1000LDHW● Capacity U-250PZH2E8/PAW-VP1000LDHW at +7°C ambient temperature, heating waterfrom +10°C to 55°CCapacity Performance Data with peak cut demand 70 %/14 kW, heating up time 173 min● Capacity U-10ME2E8/PAW-VP1000LDHW at +7°C ambient temperature, heating waterfrom +10°C to 55°CCapacity Performance Data with peak cut demand 70 %/16 kW, heating up time 144 min● Capacity U-250PZH2E8/PAW-VP750LDHW at +7°C ambient temperature, heating waterfrom +10°C to 55°CCapacity Performance Data with peak cut demand 70 %/14 kW, heating up time 150 min● Capacity U-10ME2E8/PAW-VP750LDHW at +7°C ambient temperature, heating waterfrom +10°C to 55°CCapacity Performance Data with peak cut demand 70 %/16 kW, heating up time 121 min● Capacity U-100PZH2E8/PAW-VP500LDHW at +7°C ambient temperature, heating waterfrom +10°C to 55°CCapacity Performance Data with peak cut demand 70 %/7 kW, heating up time 126 min● Capacity U-100PZH2E8/PAW-VP200LDHW at +7°C ambient temperature, heating waterfrom +10°C to 55°CCapacity Performance Data with peak cut demand 60 %/5 kW, heating up time 133 min