2.8.2 Procedure OverviewWhen connecting the wireless system, use extreme care in conducting the site survey. An incorrectly performedsite survey can result in poor service area, frequent noise, and disconnection of calls.1. Investigate the installation siteRefer to "2.8.3 Site Planning".a. Obtain a map of the CS installation site.b. Identify the service area required by the user on the map.c. Plan the location of each CS, taking account of distance, building materials, etc.2. Prepare the CS for site surveyRefer to "2.8.4 Before Site Survey".a. Assign a CS number to each CS by setting the DIP switches on the back of the CS.b. Supply electricity to each CS using an AC adaptor/battery box or by connecting them to a Super HybridPort or a DLC card.c. Install each CS temporarily as planned.Note• Install at least 2 m above the floor.• Keep the antennas in the upright position.3. Conduct the site surveyRefer to "2.8.5 Site Survey".a. Test the radio signal strength using the PS.Confirm that the radio signal strength level is "12" near the CS.Using the KX-TD7684/KX-TD76940 << SEARCHING >> CS NO.1 LEVEL:12SAVE:01234567891 9Press 1, 9, and POWERfor more than 2 seconds.Display example:1 to 9CS No.Using the KX-TD7680Display example:Press 1, 9, and POWERfor more than 2 seconds.<< SEARCHING >> CS NO.1 LEVEL:12SAVE:01234567891 to 9CS No.1 9 0Using the KX-TD7690Display example:Press 1, 9, and POWERfor more than 2 seconds.<< SEARCHING >> CS NO.1 LEVEL:12SAVE:01234567891 to 9CS No.1 99 0Installation Manual 1552.8.2 Procedure Overview