• Use a 63.5 mm (2.50 in.) or larger supply pipe to provide the correct flow to four 19 mm (0.75 in.) supplyhoses, with a 120 kW CDU.• Use an 88.9 mm (3.50 in.) or larger supply pipe to provide the correct flow to nine 19 mm (0.75 in.) supplyhoses, with a 300 kW CDU.To stop the flow of water in individual legs of multiple circuit loops, install shutoff valves for each supply andreturn line. This provides a way to service or replace an individual heat exchanger without affecting theoperation of other heat exchangers in the loop.To ensure that water specifications are being met and that the optimum heat removal is taking place, usetemperature and flow metering (monitoring) in secondary loops.Anchor or restrain all manifolds and pipes to provide the required support and to avoid movement whenquick-connect couplings are being attached to the manifolds.Figure 24 “The following figure” on page 25 shows another layout for multiple water circuits.Figure 24. Typical central manifold (at a central location for multiple water circuits)Figure 25 “The following figure” on page 26 shows an extended manifold layout.Chapter 2. Set up Rear Door Heat eXchanger V2 25