P-Trap Installation:91698. Tail Piece1. Slip Joint Nut2 Black Washer7. Bottle TrapCountertop4. Waste Cover6. Horizontal Leg3. Slip Joint Nut5. Black WasherRemove horizontal leg and slip joint nut from bottle trap.2. Apply tefion to all exposed threads.3. Insert slip joint nut(3) and waste cover(4) onto horizontal leg(6).4. Insert horizontal leg into wall waste opening, do not tighten.5. Insert black washer(2) and slip joint nut(l )onto tail piece(8)Attach bottle trap(7) to tail piece and hand tighten slip joint nut(l ).7. Align bottle trap with horizontal leg and tail piece, at this point it maybe necessary to cut part of tail piece or part of horizontal leg to obtainproper alignment.8. After all components have been properly aligned, insert horizontal legmaking sure to insert black washer(5) before tightening slip joint nut(3).Thread both slip joint nuts onto bottle trap and tighten along with slipjoint securing horizontal leg to wall waste opening.10. Check for leakage by opening faucet and letting water run for at least45 seconds.02017-01 -EL KingstonBrassrAucrrunrwww.kingstonbrass.comTOLL-FREE CUSTOMER SERVICE: I -877-2-KBRASSTECHNICAL SUPPORT E-mail: service@kingstonbrass.com12775 Reservoir street, Chino, CA91 710