3-12 Keysight N5241A/42A/49A Service GuideTests and AdjustmentsPreliminary Checks3-Preliminary ChecksPreliminary checks include the following:— “The Operator’s Check” on page 3-12The operator’s check tests the network analyzer’s basic functionality of thesource, switch, and receivers.— “The Test Port Cable Checks” on page 3-15The test port cable checks are not required, but are recommended to verifythe performance of the test port cables before performing the verificationtest.The Operator’s CheckThe operator’s check is a software driven test that checks the basic operationof the assemblies in all of the measurement port signal paths. By performingthe operator’s check, the following are tested:— attenuation ranges of all installed attenuators— calibration of the receivers— frequency response of the receivers— phase lock and leveling— noisefloorandtracenoiseAccessories Used in the Operator’s CheckPerforming the Operator’s Check1. Press UTILITY , then , then .2. In the PNA Operator’s Check dialog box (refer to Figure 3-3), underConfigure, select either Prompt for attachment of Short/Open, to pause ateach step in the process to allow moving the short/open to theappropriate port, or Shorts/Opens are attached to ALL ports, to runthrough the test without stopping. Shorts and opens can be mixed on thetest ports.To achieve the maximum system stability, allow the analyzer to warm upfor at least 15 minutes before performing the Operator’s Check.Equipment Type Part NumberFemale short, 3.5 mm (any short from the 85052B calibration kit)Female open, 3.5 mm (any open from the 85052B calibration kit)System Service Operator’s Check