Getting Started Welcome10 EPM-P Installation GuideWelcomeWelcome to the Keysight Technologies E4416A and E4417A EPM-P SeriesPeak and Average Power Meters Installation Guide. This guide shows you howto:• physically check the power meter• adjust the carrying handle• switch it on• confirm the meter passes the power on self test• connect it to a power sensor• carry out a zero and calibration routine• make connections to the rear panel• configure the remote programming interfaces• attach the rack mounting kits (supplied with Option 908 or Option 909)N OT E Both single and dual channel power meters with variety of rear panelconfigurations have been used for the illustrations in this guide. Your powermeter may differ in detail to those shown.Initial InspectionPlease inspect the shipping container for damage. If the shipping container orpackaging material is damaged, it should be kept until the contents have beenchecked mechanically and electrically. If there is mechanical damage, notify thenearest Keysight Technologies office. Keep the damaged shipping materials (ifany) for inspection by the carrier and a Keysight representative. If required, youcan find a list of Keysight Sales and Service Offices on page 44.Before continuing, please ensure you have read and understood the precedingsafety information.