Assembly and installation363.5 After installation1.Connect power supply2.Check operation.The installation has been carried out correctly if the following points apply:Controller (LEDs see Fig. Fehler! Verweisquelle konnte nicht gefunden werden.)- Power supply LEDs illuminated (LEDs 15, 16, 17)- All LEDs of open contacts illuminated (LEDs 10, 11, 12, 13)- LEDs of closed contacts not illuminated (LEDs 10, 11, 12, 13)- LEDs of the RS-485 interfaces not flashing (LEDs 1, 2, 4)- Network connection LED illuminated (yellow LED at network connection)Configuration and initial start-upThe system configuration and the configuration of the Micro SD cards take place via thesoftware and are carried out by the system supplier customer service department. The initialstart-up of the access control system is also carried out by the system supplier customerservice department.For more information about starting up and configuring the SD card and the overall system,see Dialock 2.0 user manual.