-10-7. OPERATIONAL INSTRUCTIONS(Explanation referring to general drawing during operation.)【1】 Anchoring Core Drill◎ Core Drill can be anchored by means of Anchor Bolt, Vacuum Pad or Support Jack.Follow the below procedures for bolt anchor method.【2】 Anchoring Core Drill by Anchor Bolt1.Installation of anchor bolt1) Drill anchor bolt hole, using a hammer drill.2) Set anchor bolt (W1/2) into the hole.2.Installation of Core Drill1) Screw bolt (W1/2) into Anchor Bolt.2) Insert bolt (W1/2) into the slot of Pole Base and fasten square washer and hex. nut.(W1/2)3) Install Drill Head onto pole.4) Adjust the position of Pole Base so as to align main shaft with the hole to be drilled.5) Adjust leveling with leveling bolts so as to eliminate rattling of pole base.After completion of adjustment, secure leveling bolt with wing nut.6) Tighten hex. nut to secure Pole Base.7) Set desired rotating speed with speed change knob.Model Speed change Position Applicable Core Bit Dia.mm inchSPZ-252U2i 1150min-1 27 ~ 110 1 ~ 3-1/2490min-1 120 ~ 254 4 ~ 103.Installation of Core Bit◎ Thread Core Bit onto main shaft.4.Installation of Water Collector◎ Secure Water Collector with Water Collector Fitting. WARNINGBe sure to use Water Collector to prevent spattered water from getting into motorduring operation.5.Arrangement for water disposal◎ Receive water into a bucket by connecting a hose with drain port of water collector orsuck water through drain port using a vacuum cleaner.