Installation PreparationTOOLS AND MATERIALS REQUIRED(NOT SUPPLIED)Aluminizedduct tapePencil and tape measuret 'SSpirit leveIKnife @Step ladderPlumb line_4_ 1/4" pivoting__._socketNeedle-nose pliersSilicone@Safety glasses Wire nutsGlovesFlashlight Phillips and flat-bladescrewdriversc_½1" conduit (for remotemounting only)3/8" socket/nut driverTin snipsWire cutter/stripperElectric drill andappropriate bits8" ducting andcaps as needed©Strain reliefREMOVE THE PACKAGINGCAUTION: Wear glovesto protectagainstsharp edges.CAUTION: LIFTTHE INSERT SLEEVEOUT OF THE BOX BY GRASPING THE SIDES.1.Open hood carton.2. Remove the liner,foam and cardboard.3. Remove the tape securing the filters to the insertsleeve, lift the tabs and remove the filters.4. Unscrew the 5 nuts securing the damper ventplate assemblg, and remove it from the insertsleeve. Set the 5 nuts and the damper vent plateassemblg aside, as gou will be re-installing it laterin the installation process./© ©5. Remove the screws attaching the insert sleeve tothe mounting board. Discard the screws.6. Grasp the insert sleeve bu the outside edges, andlift straight up and out of the carton.NOTE: Do not lift the insert sleeve bu the blowermotor.7. Remove and properly discard the plastic wrapping.8. Remove the parts box and other packaging.11