ELECTRICALCULINARIAN SERIES40POST-INSTALL CHECKINSTALLER CHECKLISTFINAL CHECKLISTGAS SUPPLY Connection: 1/2" NPT with a minimum of 5/8" diameter flex line The appliance is connected only to the type of gas for which it iscertified for use Manual gas shut-off valve installed in an accessible location (withoutrequiring removal of range) Unit tested and free of gas leaks Gas supply pressure does not exceed 14" (37 mb) W.C. Placement of unit Specified clearances maintained to cabinet surfaces Unit Level – front to back – side to side Burner caps and retention rings positioned properly on sealedburner bases All packing materials removed Island trim or back guard attached (if horizontal clearance to combustible materials behind cookingsurface is less than 12") Check door adjustment and hold down bracketsNote to Customer.Please make sure installer signs each item on thischecklist, explains each item before leaving and ex-plains the range operation to you thoroughly.OPERATION Receptacle with correct over current protec-tion is provided for service cord connection Proper ground connection Proper polarity at receptacle Kick panel in place and 3 screws secure. All internal packing materials removed. Checkbelow grates and grill pans and inside the ovens If used on Propane gas, verify that the propanegas supply is equipped with its own high-pressureregulator in addition to the pressure regulator sup-plied with appliance.Burner caps properly seatedinto burner bases.Grill Components properly seated (not all models).Bezels centered on burner knobs and knobs turnfreely. Each burner lights satisfactorily, both individuallyand with other burners operating Air shutter adjustment for proper flame made for Grill and Griddle sections. Griddle is level and does not rock. Oven door hinges seated and hinge locks in properposition. Door opens and closes properly. Burner grates correctly positioned, level and do notrock.