Storage system | Installation manual Bosch Power Tec GmbHDO_IA_2013_HYB_A_3ENG_ABo 17.01.20144 | Table of Contents EnglishEnglish4 Flow chart 495 Delivery and positioning 515.1 Delivery 515.2 Transporting to the installation location (haulage contractor) 515.3 Unpack the storage system (fitter) 525.4 Installing the housing feet 535.5 Positioning the housing 546 Installation 576.1 Safety instructions 576.2 Removing the external housing parts 586.2.1 Removing the housing cover 586.2.2 Removing the side panels 596.2.3 Removing the front panel 626.2.4 Removing the ventilation grille 646.2.5 Removing the battery cover 656.3 Securing the housing against tipping over 666.4 Installing and connecting the batteries 676.5 Installing the battery cover 716.6 Installing the ventilation grille 736.7 Installing the battery management module (BMM) 736.8 Battery converter 766.8.1 Mounting 766.8.2 Connecting to the internal distribution box 776.9 String inverter capacitor 796.9.1 Mounting 796.9.2 Connecting to the internal distribution box 806.10 Installing the distribution box cover 826.11 Installing the front panel 826.11.1 Connecting the battery converter and the string inverter 856.11.2 Connecting the battery converter to the cable harness 866.11.3 Connecting the string inverter to the cable harness 886.12 Connecting the battery management system (BMM) 896.13 Earthing connections overview 906.14 Connecting the battery cable 916.15 Installing the external housing parts 926.15.1 Install the earthing cables for the mounting plate/door channel 926.15.2 Installing the side panels 93