Baintech 100A Installation Instructions Manual
Dual Battery Kit 100AInstallation Instructions V1.0Kit Contents 4 x 16-M8 lugs 2 x MT16-M6 lugs 4 x red heat shrink lengths 2 x black heat shrink lengths 6m of 16mm2 red battery cable 0.5m of 16mm2 black battery cable 2 x terminal wing nuts 4 cable ties Inline Fuse holder 3A Fuse 100A Voltage Control RelayPre - Installation1. Disconnect both batteries by removing both the positive and negative terminalsbefore commencing installation.2. Ensure the Auxiliary Battery is mounted securely to prevent movement in any direction.VCR Installation1. The VCR is to be mounted on a flat dry surface. The VCR must be kept well away from hotitems, such as exhaust systems or turbo chargers.2. Check the inline fuse holder has a chassis connection point that can be reached from theVCR installation location.Cable ConnectionPrior to attaching cables: Determine the cable lengths required. Strip the plastic insulation off the end of the cable for approximately 15mm, fit theappropriate connector and crimp in place. Slide the heat shrink over the connectors and heat with a heat gun until secure. Ensure cables are securely installed using cable ties and are away from moving parts. Ensure cable insulation is protected against rub points which could cause short circuits. Install correctly rated fuse to protect the battery positive cables. Check the chassis connection points are electrically connected to the start battery negativeterminals.Refer to the installation diagram when installing cables.1. Attach 16mm2 red cable from Auxiliary battery positive terminal to the VCR M6 studlabelled 87.2. Attach 16mm2 red cable from Starter battery positive terminal to the VCR M6 stud labelled30.Bainbridge technologies :: 1224 Lytton Rd Hemmant :: www.baintech.com.au :: 1300 224 864 |
Related manuals for Baintech 100A
This manual is suitable for:
Product
Menu
Learn More
Menu
Legal
Menu
Copyright © 2024 OneStart. All Rights Reserved