The range is installed adjacent to the LH side of an AGA Total Control/AGA Dual Control.Installation of the Module must, therefore be in conjunction with the build instructions of the ‘parent’ AGA Total Control/AGADual Control.Reference must be made to the above Installation Instructions for the ‘parent’ AGA especially regarding pre-site inspection,not only for both cookers but to consider any pipework that may pass at the rear of the Module. i.e. vent pipe from ‘parent’AGA.The appliance has been designed to accommodate pipework passing at the rear.NOTE! THE MAIN AGA TOTAL CONTROL/ AGA DUAL CONTROL IS DELIVERED EX-WORKS FULLY ASSEMBLED.FINAL INSTALLATION IS UNDERTAKEN ON SITE, BY AN AUTHORISED AGA ENGINEER.The AGA TC/DC Module is supplied from the manufacturers in a fully assembled condition.11INSTALLATION SEQUENCE AND PROCEDUREInstallation must be to Local and National Wiring Regulations and carried out by a Qualified Engineer.Having ensured all space requirements and regulations have been satisified for the combined arrangement (AGA Total /Dual Control and Module), the build and installation is to proceed as follows:-1. It is essential that the base or hearth on which both range and module stands should be level and capable ofsupporting the total weight of the appliance.AGA Total Control (TC3) = 816 lbs (370kgs) AGA Dual Control - Gas (DC3G) = 996 lbs (452kgs)Hotcupboard (TC5 / DC5) = 242 lbs (110kgs) AGA Dual Control - Electric (DC3E) = 978 lbs (444kgs)Module = 284 lbs (129kgs)2. Unpack and remove the Module from the pallet.3. Check that the rear extension piece is secured to the left hand side panel.4. Release 2 screws from front tongue bracket and allow the bracket to drop downwards. Now slide the Module off its plinthand set to one side.Fig. 4 DESN 516863