• Three-phase test kit or other test equipment depending on the complexity of theconfiguration and functions to be tested.• PC with PCM600 installed along with the connectivity packages corresponding to theIEDs to be tested.• Administration rights on the PC, to set up IP addresses• Product documentation (engineering manual, installation manual, commissioningmanual, operation manual, technical manual and communication protocol manual)3.3 Checking the power supplyCheck that the auxiliary supply voltage remains within the permissible input voltage rangeunder all operating conditions. Check that the polarity is correct before powering the IED.3.4 Energizing the IED3.4.1 Checking the IED operationCheck all connections to external circuitry to ensure correct installation, before energizingthe IED and carrying out the commissioning procedures.Energize the power supply of the IED to pickup. This could be done in a number of ways,from energizing a whole cubicle to energizing a single IED. Set the IED time if no timesynchronization source is configured. Check the self-supervision function in Main menu/Diagnostics/Internal events or Main menu/Diagnostics/IED status/General menu inlocal HMI to verify that the IED is functioning properly.3.4.2 IED start-up sequenceThe following sequence is expected when the IED is energized.• The green Ready LED picks up flashing instantly and the ABB logo is shown on theLCD.• After approximately 30 seconds, "Starting" is shown on the LCD.• Within 90 seconds, the main menu is shown on the LCD and the green Ready LEDshows a steady light, which indicates a successful pick up.The pickup time depends on the size of the application configuration.Application configurations with less functionality have shorter pickuptimes.Section 3 1MRK 505 293-UUS AStarting up22Commissioning manual