18 Electrical installationInstallation checklistCheck the mechanical and electrical installation of the drive before start-up. Gothrough the checklist below together with another person. Read chapter Safety onpage 5 before you work on the drive.CheckMECHANICAL INSTALLATIONThe ambient operating conditions are allowed. (See Technical data: Losses, cooling dataand noise and Ambient conditions in ACS310 User’s Manual (3AUA0000044201[English]).)The drive is fixed properly on an even vertical non-flammable wall. (See Mechanicalinstallation on page 9 and Mechanical installation in ACS310 User’s Manual(3AUA0000044201 [English]).)The cooling air will flow freely. (See Mechanical installation: Install the drive on page 9.)The motor and the driven equipment are ready for start. (See Planning the electricalinstallation: Checking the compatibility of the motor and drive as well as Technical data:Motor connection data in ACS310 User’s Manual (3AUA0000044201 [English]).)ELECTRICAL INSTALLATION (See Electrical installation on page 13 and Planning theelectrical installation in ACS310 User’s Manual (3AUA0000044201 [English]).)For ungrounded and corner grounded systems: The internal EMC filter is disconnected(EMC screw removed).The capacitors are reformed if the drive has been stored over two years.The drive is grounded properly.The input power voltage matches the drive nominal input voltage.The input power connections at U1, V1 and W1 are OK and tightened with the correcttorque.Appropriate input power fuses and disconnector are installed.The motor connections at U2, V2 and W2 are OK and tightened with the correct torque.The motor cable, input power cable and control cables are routed separately.The external control (I/O) connections are OK.The input power voltage cannot be applied to the output of the drive (with a bypassconnection).Terminal cover and, for NEMA 1, hood and connection box, are in place.