Mitsubishi Electric TG-2000A manuals
TG-2000A
Table of contents
- Table Of Contents
- Table Of Contents
- Safety precautions
- Outline of product
- Function
- Centralized monitoring/controlling by Web browser
- Centralized control by integrated software TG-2000A
- Remote monitoring/controlling - Transmitting of abnormal mail
- Comparison table of function
- Products list
- Specification
- System design flow
- Step 1 : Selection of air conditioning equipment
- Limitation on transmission line wiring
- A-control transmission line
- Step 2 : Selecting system management parts
- Regarding power supply within the system
- Selecting the power supply unit
- When managing a K-control model
- External input/output
- External output signal function
- Centralized monitoring using a PC
- About floors, blocks, and groups
- Centralized control PC (local arrangement)
- About password control
- About LAN
- LAN wire length
- Step4 : Implementing annual/weekly schedules
- Weekly schedule using the G-50A
- Weekly schedule of the integrated software
- Step 5: Charging Function of Energy Charge Measuring
- Selection of Charging Function
- Basic Composition and Required Materials
- Watt-hour meter pulse counting (apportioning) method
- Measuring instrument pulse counting (direct reading) method
- Power consumption PC direct reading system (Apportioning system)
- Mechanism of Charge Calculation
- Apportioning calculation method of outdoor unit
- Apportioned calculation of indoor unit
- Manual input of electric power consumption
- In the case of measuring instrument pulse counting (direct reading) method
- Output of Charging Data
- Charging Method
- Caution for Using Charging Function
- Step 6: Energy Saving/Peak Cut Control
- Outline
- Energy Saving Control/Peak Cut Control
- Peak cut control
- Current energy saving control Status
- Energy Saving Control System Design Flow
- Step 7: Selection of Measuring Instruments
- Step 8: General Purpose Equipment Control
- Determine the control items
- PLC assignment
- Setting of TG-2000A
- Step 9: Determining Number of PLC Units
- PLC's for Pulse Count Function
- PLC for General-purpose Control Function
- Terminal connection diagram
- PLC Software
- External View of Sequencer
- PLC Wiring Diagram
- Step 10:Determination of Address for Air Conditioning Instrument and PC for Control
- Setting method for connecting G-50A to exclusive LAN
- Setting method for connecting G-50A to existing LAN
- Setting for Remote Monitoring
- Setting of Abnormal Mail Transmission System
- Preparations before performing abnormal mail transmission
- System Using Optical Cable for LAN
- Step 11: Confirmation of Other Functions
- User registration from administrator
- Trend Data Output Function
- Preparation for outputting parameter files
- Example of CSV files output
- Graphing trend data
- Initial Setting Tool
- Composition of Initial Setting Tool
- Connection to G-50A
- Other function
- Auto-changeover mode