OneStart

Siemens SIMOTICS FD 1LN1 manuals

SIMOTICS FD 1LN1 first page preview

SIMOTICS FD 1LN1

Brand: Siemens | Category: Engine
Table of contents
  1. Table Of Contents
  2. Assembly
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. Table Of Contents
  11. Disposal
  12. Safety information
  13. Qualified personnel
  14. Electrostatic sensitive devices
  15. Interference voltages when operating the converter
  16. Description
  17. Preparations for use
  18. Space requirement
  19. Configuration of the cooling circuit and coolant supply
  20. Pressures and differential pressures in the cooling circuit
  21. Potential equalization on the cooling circuit components
  22. Coolant specification
  23. Inhibitors, anti-freeze, biocides
  24. Cooling capacity derating
  25. Interlock circuit for the external fan motor
  26. IM B5 type of construction with support foot
  27. Voltage and frequency fluctuations during line operation
  28. Transport
  29. Checking the delivery
  30. Securing the rotor
  31. Figure 4-1 Axial fastening of the rotor
  32. Lifting and transporting the machine
  33. Protecting the cooling water circuit during storage
  34. Protection against corrosion
  35. Converter input voltage
  36. Insulated bearings when operating the converter
  37. Converter operation on a grounded network
  38. Safety instructions for mounting
  39. Preparations for installation
  40. Testing the insulation resistance and polarization index
  41. Prepare the mating faces (IM B3)
  42. Checking the load handling attachments
  43. Removing anti-corrosion protection
  44. Lifting and transportation
  45. Putting the machine down
  46. Draining condensation
  47. Roughly aligning the machine
  48. Installing the machine
  49. Figure 5-4 Schematic diagram: Aligning the machine to the driven machine
  50. Aligning the machine to the driven machine and attaching it to it (IM B5)
  51. Aligning the machine to the driven machine and attaching it to it (IM V1, IM V10)
  52. Connecting the cooling water supply
  53. Safety instructions for the electrical connection
  54. Terminal box
  55. Terminal box 1XB1621
  56. Terminal box 1XB7730
  57. Terminal box 1XB7731
  58. Terminal box 1XB7750
  59. Mounting/removing the terminal box
  60. Preparation
  61. Connecting the grounding conductor
  62. Connection without terminal box
  63. Connecting the machine for a specific direction of rotation
  64. Inserting and routing the cables
  65. Bringing cables into the terminal box 1XB... with cable gland
  66. Laying cables
  67. Connecting cables without cable lugs
  68. Figure 6-10 Connection using terminal clamps (schematic diagram)
  69. Use of aluminum conductors
  70. Stepless mating face for the seal in the terminal box cover
  71. Finishing connection work
  72. Bringing cables into the auxiliary terminal box and routing them
  73. Connecting temperature monitoring for the stator winding
  74. Terminating the connection work (auxiliary circuit)
  75. Checks to be carried out prior to commissioning
  76. Converter operation
  77. Greasing the roller bearings prior to commissioning
  78. Setting the automatic regreasing system
  79. Setpoint values for monitoring the bearing temperature
  80. Set values for monitoring the winding temperature
  81. Switching off
  82. Figure 7-1 Selecting a motor type
  83. Figure 7-2 Entering the motor data
  84. Commissioning at the SINAMICS S/G converter using the AOP30
  85. Commissioning at the SINAMICS G120P inverter using the IOP
  86. Safety instructions for operation
  87. Switching on the machine
  88. Avoidance of frost and corrosion damage in the cooling system
  89. Measurement of the insulation resistance after an extended stop
  90. Re-commissioning the machine
  91. Electrical faults
  92. Air-to-water cooler faults
  93. Faults at the external fan
  94. Roller bearing faults
  95. Inspection and maintenance
  96. Measuring the insulation resistance during the course of maintenance work
  97. General inspection
  98. Inspection of the cooling system
  99. Regreasing intervals and types of grease for operating roller bearings
  100. Sealing the rolling-contact bearings ("Increased degree of protection" option)
  101. Cleaning the air-to-water heat exchanger
  102. Touch up any damaged paintwork
  103. Corrective Maintenance
  104. Screws with preCOTE coating
  105. Adjusting the external fan
  106. Roller-contact bearings
  107. Removing the labyrinth sealing ring
  108. Installing roller bearings
  109. Install the V ring
  110. Installing the V ring ("Increased degree of protection" option)
  111. Top enclosure
  112. Removing the top enclosure
  113. Mounting the top enclosure
  114. Seal the motor
  115. Ordering data
  116. Ordering spare parts via the Internet
  117. Housing, stators and rotors
  118. Roller bearing cartridge at the drive and non-drive end
  119. Terminal box 1XB1631
  120. Terminal box 1XB7740
  121. Auxiliary terminal box 1XB9014
  122. Auxiliary terminal box 1XB9015
  123. XB9016 auxiliary terminal box
  124. Auxiliary terminal box 1XB302
  125. Preparing for disassembly
  126. B.1 Tightening torques for screw and bolt connections
  127. Index
Related products
SIMOTICS FDSIMOTICS FD 1LM1SIMOTICS FD 1LQ1SIMOTICS FD 1MN1SIMOTICS FD 1LH1SIMOTICS FD 1LL1SIMOTICS FD 1LP1SIMOTICS FD 1MH1SIMOTICS FD 1MQ1SIMOTICS 1LG
Siemens categories
More Siemens categories