Pioneer SGY-PM900H90 manuals
SGY-PM900H90
Table of contents
- installation manual
- Table Of Contents
- Features
- Compatibility
- Product Configuration
- Before Starting Installation
- Checking the Tools You are Using
- Checking Operation of the Sensors
- Setting up the Pressure Bonding Tool
- Placing the Bicycle in a Secure Work Position Removing Crank Set
- Cleaning the Crank
- Checking the Position to Mount the Sensor
- Setting the Sensors
- Attaching the Sensors
- Pressure Bonding the Sensors
- Attaching the Strain Gauge Unit Cover
- Assembling the Chainring
- Tying Down the Right Transmitter
- Installing the Junction Cable Guide
- Installing the Magnet Rings
- For BB86, BB30, and PF30
- Installing the Crank Set
- Checking Operation of the Magnet Rings
- Before Pairing and Calibrating
- Pairing the Pedaling Monitor Sensor
- Specifying the Device Number to Pair it
- Checking Device Numbers
- Calibration Preparations
- Calibration
- Setting the Crank Length and Calibrating Weight
- Calibrating with a Load on the Pedals
- Calibrating the Zero Point
- Checking the Calibration
- Troubleshooting
- Error codes
- Repairing and Replacing the Sensor
- Removing the Entire Sensor
- Replacing the Rubber Gaskets
- Care, Maintenance, and Storage
- Specifications
- technische daten
- technische gegevens