Dell PowerConnect B-DCX-4S Backbone manuals
PowerConnect B-DCX-4S Backbone
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- about this document
- supported hardware and software
- command syntax conventions
- additional information
- getting technical help
- esd precautions
- In this chapter
- Hardware components
- Port side of the PowerConnect B-DCX-4S
- Nonport side of the PowerConnect B-DCX-4S
- High availability
- Reliability
- Software features
- Network manageability
- Time and items required
- Preparing for PowerConnect B-DCX-4S installation
- Unpacking and installing the PowerConnect B-DCX-4S
- Items included with the PowerConnect B-DCX-4S
- PowerConnect B-DCX-4S Configuration Overview
- Powering on the PowerConnect B-DCX-4S
- connecting a serial cable between powerconnect b-dcx-4s and host
- Logging in to the serial console port
- Customizing a switch name
- Customizing a chassis name
- Setting the date
- Synchronizing local time
- Installing SFPs and attaching cables
- Verifying correct operation and backing up the configuration
- Monitoring overview
- Determining the status of a control processor blade (CP8)
- Determining status of a core switch blade (CR4S-8)
- Determining the status of a power supply
- Determining the status of a blower assembly
- Determining the status of a WWN card
- Introduction
- Removing a chassis door
- Removing a cable management finger assembly
- RRP: Port, application, and encryption blades
- Replacing a blade
- RRP: Blade filler panel
- Replacing a filler panel
- Verifying the necessity of replacement
- Removing a control processor blade (CP8)
- Replacing a control processor blade (CP8)
- RRP: Core switch blade (CR4S-8)
- Removing a core switch blade (CR4S-8)
- Replacing a core switch blade (CR4S-8)
- RRP: Power supply
- Replacing a power supply
- Removing a blower assembly
- Replacing a blower assembly
- Removing the WWN bezel (logo plate) and WWN card
- Replacing the WWN bezel (logo plate) and WWN card
- RRP: Inter-chassis link (ICL) cables
- items required
- RRP: PowerConnect B-DCX-4S chassis
- Verifying need for replacement
- Disconnecting from the network and fabric
- Removing components from the chassis
- Installing components into the new chassis
- Downloading the configuration
- Reconnecting the system to the network and fabric
- Verifying correct configuration of the fabric
- Cable routing table
- In this appendix
- System architecture
- System size and weight
- System blade and FRU weights
- Facility requirements
- Fibre Channel port specifications
- Power cords
- Power-cord notice
- Regulatory compliance
- BSMI statement (Taiwan)
- Regulatory compliance standards
- FA4-18 blade
- FS8-18 blade
- FCOE10-24 blade
- Obtaining chassis and component status
- Boot
- Troubleshooting
PowerConnect B-DCX-4S Backbone
Table of contents
PowerConnect B-DCX-4S Backbone
Table of contents