Laars Pennant PNCV manuals
Pennant PNCV
Table of contents
- SECTION
- Warranty
- Locating Pump-Mounted Water Heater with Respect to Storage Tank(s)
- Combustion Air
- Venting
- Side Wall Vent Terminal
- Vertical Vent Terminal
- Gas Supply and Piping
- a.1 heating system piping
- b.5 freeze protection – water heater
- External Staging Control Wiring
- Sequence of Operation
- Programming the Temperature Control
- Programming
- Choosing the Mode for your Application
- Advanced Topics
- Boiler Minimum (BOIL MIN)
- Setpoint Operation
- External Boiler Operation
- High Altitude Adjustment and Set Up
- System Maintenance
- Temperature Control
- Resolving Lockouts
Pennant PNCV
Table of contents
- Table Of Contents
- Introduction
- locating the appliance
- Locating Pump-Mounted Water Heater with Respect to Storage Tank(s)
- venting and combustion air
- Venting
- Category III Vent
- Side Wall Combustion Air Terminal
- vent terminals for outdoor units
- Gas Supply and Piping
- A.1 Heating System Piping Hot Supply Connections – Boiler
- water connections
- electrical connections
- main power
- Low Water Cut-Off
- operating instructions
- Temperature (Operating) Control
- limit controls
- High Altitude Adjustment and Set Up
- system maintenance
- ignition control
- Ignitor
- trouble shooting
- replacement parts