OneStart

Fujitsu M10 Series manuals

M10 Series first page preview

M10 Series

Brand: Fujitsu | Category: PCI Card
M10 Series first page preview

M10 Series

Brand: Fujitsu | Category: Server
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. related documentation
  9. text conventions
  10. document feedback
  11. Workflow for the SPARC M10-1
  12. Workflow for the SPARC M10-4
  13. Workflow for the SPARC M10-4S
  14. Direct connections between chassis (without an expansion rack)
  15. Connections through crossbar boxes (with an expansion rack)
  16. Workflow when Connecting the PCI Expansion Unit
  17. Points to note on configurations with the PCI expansion unit connected
  18. Safety Precautions
  19. Items Requiring Confirmation before Installation
  20. Confirming the Physical Specifications of the System
  21. Size and weight
  22. Installation area for a general rack
  23. Mounting conditions for expansion racks
  24. Installation area for an expansion rack
  25. Points of concern when bringing in an expansion rack
  26. Method of fixing an expansion rack in place
  27. Checking Environmental Conditions
  28. Ambient temperature
  29. Contaminant conditions
  30. Checking Cooling Conditions
  31. Checking the Power Input Type
  32. Dual power feed
  33. Three-phase power feed
  34. Uninterruptible power supply (UPS) connection (optional)
  35. Internal rack connections of an expansion rack
  36. Preparing Power Supply Facilities
  37. Power cord specifications
  38. Breaker characteristics
  39. Grounding requirements
  40. Checking External Interface Port Specifications
  41. Network configuration example
  42. Preparing the Necessary Tools/Information for Installation
  43. Confirming Delivered Components
  44. Confirming the delivered components of the SPARC M10-4
  45. Confirming the delivered components of the SPARC M10-4S
  46. Confirming the delivered components of an expansion rack
  47. Installing a Rack
  48. Securing the rack
  49. Connecting racks
  50. Mounting the Chassis in a Rack
  51. Mounting the SPARC M10-1 in a rack
  52. Mounting the SPARC M10-4/SPARC M10-4S in a rack
  53. Mounting the PCI expansion unit in a rack
  54. Mounting Optional Components
  55. Mounting optional components in the SPARC M10-4/SPARC M10-4S
  56. Setting the ID (BB-ID) Identifying a Chassis
  57. Connecting Cables (for Direct Connections between Chassis)
  58. Connecting XSCF cables
  59. Connecting Cables (for Connections through Crossbar Boxes)
  60. Connecting crossbar cables
  61. Connecting Cables to the SPARC M10-1
  62. Connecting Cables to the SPARC M10-4/SPARC M10-4S
  63. Connecting Cables to the PCI Expansion Unit
  64. Connecting Cables to a Crossbar Box
  65. Storing Cables
  66. Rack with a width of 600 mm (23.6 in.)
  67. Connecting the System Management Terminal to the Chassis
  68. Turning On the Input Power
  69. Turning on the input power and starting the XSCF
  70. Logging In to the XSCF
  71. Checking the XCP Version
  72. Checking the Altitude Setting
  73. Checking the Time Setting
  74. Performing a Diagnosis Test
  75. Checking the Component Status
  76. Setting the Password Policy
  77. Setting a User Account and Password
  78. Configuring the Telnet/SSH Service
  79. Configuring the HTTPS Service
  80. Configuring the XSCF Network
  81. Setting an XSCF host name and domain name
  82. Setting a takeover IP address
  83. Setting the routing
  84. Configuring Memory Mirroring
  85. Creating a Physical Partition Configuration List (PCL)
  86. Assigning a System Board (PSB) to a Physical Partition (PPAR)
  87. Setting a CPU Operational Mode for the Physical Partition
  88. Registering a CPU Activation Key
  89. Assigning CPU Core Resources
  90. Starting and Stopping a Physical Partition (PPAR)
  91. Confirming the System Configuration
  92. Points of concern during installation
  93. Confirming the removal pattern
  94. Points of concern during removal
  95. Preparing the Necessary Tools and Delivered Components for Installation
  96. Installing the server while the target physical partition (PPAR) is operating
  97. Installing the server after turning off the input power to the entire system
  98. Adding Expansion Rack 1 (Installation for Expansion to Up to the 8BB Configuration)
  99. Installing expansion rack 1
  100. Installing Expansion Rack 2
  101. Adding Expansion Racks 1 and 2
  102. Performing the work of installing the expansion racks
  103. Preparing the Necessary Tools for Removal
  104. Removing the server while the target physical partition (PPAR is operating
  105. Removal of Expansion Rack 2, and Decrease in the Number of SPARC M10-4S Units to Four or Less
  106. A.1   Understanding the Usual Problems and Their Corrective Actions
  107. A.2   Understanding Commands for Troubleshooting
  108. A.2.2   Checking the contents of logs
  109. A.2.3   Checking information on a component where a failure or degradation occurred
  110. A.2.4   Checking diagnosis results
  111. A.3   How to Restore a BB-ID from an Incorrect Setting
  112. A.3.2   Mistaken setting of a BB-ID other than BB#00 or BB#01
  113. A.3.3   Mistaken settings for BB#00 and BB#01
  114. B.1   2BB Configuration (Direct Connections between Chassis)
  115. B.2   3BB Configuration (Direct Connections between Chassis)
  116. B.3   4BB Configuration (Direct Connections between Chassis)
M10 Series first page preview

M10 Series

Brand: Fujitsu | Category: Server
Table of contents
  1. about this product
  2. revision history
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. CHAPTER 1 Installation Planning Overview
  9. Computer room installation
  10. Computer Room Installation Planning
  11. Preparing Building and Facilities
  12. Rooms needed to run the server system
  13. CHAPTER 2 Installation Sites
  14. Utility services
  15. Building structures
  16. Computer room location
  17. Facilities
  18. Access routes
  19. Water and fuel stocks
  20. Free-access flooring
  21. Figure 2.1 Slit floor panel
  22. Figure 2.2 Floor panels with an airflow control damper
  23. Interiors
  24. CHAPTER 3 Equipment Layout
  25. operational considerations
  26. Figure 3.1 Concept of units operational grouping
  27. air circulation
  28. Dusting
  29. Power supply facilities for air conditioners
  30. Line and Signal Wiring Facilities
  31. CHAPTER 4 Air Conditioning
  32. Air conditioning conditions and capacities
  33. Direct blowing
  34. Underfloor ventilation
  35. Combined use of direct or duct blowing and underfloor ventilation
  36. Air Conditioning Conditions
  37. Recommended temperatures and humidities for computer rooms
  38. Temperature and humidity recommendations for computer rooms
  39. Figure 4.5 Psychrometric chart applicable to changing the room temperature
  40. Figure 4.6 Psychrometric chart applicable to lowering the underfloor temperature
  41. corrosive gases
  42. Seawater (salt damage)
  43. Thermal Load and Cooling Capacities
  44. Example of cooling capacity calculations for room air conditioning
  45. Underfloor ventilation air conditioning
  46. Convenient formulas for air conditioning capacities
  47. Precautions Pertaining to the Installation of Air Conditioners
  48. Air conditioner filters
  49. Installing temperature/humidity sensors
  50. Preventing dew condensation in underfloor ventilation
  51. Preventing water leaks and installing detectors
  52. Installing a backup unit
  53. magnetic fields
  54. CHAPTER 5 Electromagnetic Environment and Static Electricity
  55. Magnetic field control
  56. electric fields
  57. Static Electricity
  58. CHAPTER 6 Power Supply Facilities
  59. Calculating the power required
  60. Power Supply Facilities
  61. Selecting power supply facilities
  62. UPS Requirements
  63. Figure 6.3 Commutating load circuit
  64. Grounding
  65. Grounding equipment in the computer room
  66. Grounding other equipment
  67. Grounding LAN devices
  68. Grounding-plate method
  69. Figure 6.6 Grounding-plate method
  70. Distribution Panels
  71. Distribution panel structure
  72. Figure 6.9 Round crimp terminal dimensions
  73. Distribution Lines
  74. Share of Responsibility for Construction in a Computer Room
  75. Distribution Line Insulation Testing
  76. CHAPTER 7 Protection Against Lightning
  77. Protection of AC Line
  78. Figure 7.1 Surge absorber (power outlet connected type)
  79. Protection of Signal Lines
  80. basic concepts
  81. Objects of security
  82. Kinds of disasters
  83. Figure 8.1 Designating alarm zones
  84. Earthquakes
  85. Water damage
  86. Burglary
  87. Rat damage
  88. Maintenance and Management of Disaster Control Facilities
  89. Appendix A Conversion Information
  90. A.2 Fraction to Decimal Equivalence
  91. Acronyms & Abbreviations
  92. Index
M10 Series first page preview

M10 Series

Brand: Fujitsu | Category: Chassis
Related products
SPARC M10ETERNUS HX2000 SeriesSMARTCASE S520Storage ETERNUS AX2100D3654-BD3664-B
Fujitsu categories
More Fujitsu categories