Fujitsu M10 Series manuals
M10 Series
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- related documentation
- text conventions
- document feedback
- Workflow for the SPARC M10-1
- Workflow for the SPARC M10-4
- Workflow for the SPARC M10-4S
- Direct connections between chassis (without an expansion rack)
- Connections through crossbar boxes (with an expansion rack)
- Workflow when Connecting the PCI Expansion Unit
- Points to note on configurations with the PCI expansion unit connected
- Safety Precautions
- Items Requiring Confirmation before Installation
- Confirming the Physical Specifications of the System
- Size and weight
- Installation area for a general rack
- Mounting conditions for expansion racks
- Installation area for an expansion rack
- Points of concern when bringing in an expansion rack
- Method of fixing an expansion rack in place
- Checking Environmental Conditions
- Ambient temperature
- Contaminant conditions
- Checking Cooling Conditions
- Checking the Power Input Type
- Dual power feed
- Three-phase power feed
- Uninterruptible power supply (UPS) connection (optional)
- Internal rack connections of an expansion rack
- Preparing Power Supply Facilities
- Power cord specifications
- Breaker characteristics
- Grounding requirements
- Checking External Interface Port Specifications
- Network configuration example
- Preparing the Necessary Tools/Information for Installation
- Confirming Delivered Components
- Confirming the delivered components of the SPARC M10-4
- Confirming the delivered components of the SPARC M10-4S
- Confirming the delivered components of an expansion rack
- Installing a Rack
- Securing the rack
- Connecting racks
- Mounting the Chassis in a Rack
- Mounting the SPARC M10-1 in a rack
- Mounting the SPARC M10-4/SPARC M10-4S in a rack
- Mounting the PCI expansion unit in a rack
- Mounting Optional Components
- Mounting optional components in the SPARC M10-4/SPARC M10-4S
- Setting the ID (BB-ID) Identifying a Chassis
- Connecting Cables (for Direct Connections between Chassis)
- Connecting XSCF cables
- Connecting Cables (for Connections through Crossbar Boxes)
- Connecting crossbar cables
- Connecting Cables to the SPARC M10-1
- Connecting Cables to the SPARC M10-4/SPARC M10-4S
- Connecting Cables to the PCI Expansion Unit
- Connecting Cables to a Crossbar Box
- Storing Cables
- Rack with a width of 600 mm (23.6 in.)
- Connecting the System Management Terminal to the Chassis
- Turning On the Input Power
- Turning on the input power and starting the XSCF
- Logging In to the XSCF
- Checking the XCP Version
- Checking the Altitude Setting
- Checking the Time Setting
- Performing a Diagnosis Test
- Checking the Component Status
- Setting the Password Policy
- Setting a User Account and Password
- Configuring the Telnet/SSH Service
- Configuring the HTTPS Service
- Configuring the XSCF Network
- Setting an XSCF host name and domain name
- Setting a takeover IP address
- Setting the routing
- Configuring Memory Mirroring
- Creating a Physical Partition Configuration List (PCL)
- Assigning a System Board (PSB) to a Physical Partition (PPAR)
- Setting a CPU Operational Mode for the Physical Partition
- Registering a CPU Activation Key
- Assigning CPU Core Resources
- Starting and Stopping a Physical Partition (PPAR)
- Confirming the System Configuration
- Points of concern during installation
- Confirming the removal pattern
- Points of concern during removal
- Preparing the Necessary Tools and Delivered Components for Installation
- Installing the server while the target physical partition (PPAR) is operating
- Installing the server after turning off the input power to the entire system
- Adding Expansion Rack 1 (Installation for Expansion to Up to the 8BB Configuration)
- Installing expansion rack 1
- Installing Expansion Rack 2
- Adding Expansion Racks 1 and 2
- Performing the work of installing the expansion racks
- Preparing the Necessary Tools for Removal
- Removing the server while the target physical partition (PPAR is operating
- Removal of Expansion Rack 2, and Decrease in the Number of SPARC M10-4S Units to Four or Less
- A.1 Understanding the Usual Problems and Their Corrective Actions
- A.2 Understanding Commands for Troubleshooting
- A.2.2 Checking the contents of logs
- A.2.3 Checking information on a component where a failure or degradation occurred
- A.2.4 Checking diagnosis results
- A.3 How to Restore a BB-ID from an Incorrect Setting
- A.3.2 Mistaken setting of a BB-ID other than BB#00 or BB#01
- A.3.3 Mistaken settings for BB#00 and BB#01
- B.1 2BB Configuration (Direct Connections between Chassis)
- B.2 3BB Configuration (Direct Connections between Chassis)
- B.3 4BB Configuration (Direct Connections between Chassis)
M10 Series
Table of contents
- about this product
- revision history
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- CHAPTER 1 Installation Planning Overview
- Computer room installation
- Computer Room Installation Planning
- Preparing Building and Facilities
- Rooms needed to run the server system
- CHAPTER 2 Installation Sites
- Utility services
- Building structures
- Computer room location
- Facilities
- Access routes
- Water and fuel stocks
- Free-access flooring
- Figure 2.1 Slit floor panel
- Figure 2.2 Floor panels with an airflow control damper
- Interiors
- CHAPTER 3 Equipment Layout
- operational considerations
- Figure 3.1 Concept of units operational grouping
- air circulation
- Dusting
- Power supply facilities for air conditioners
- Line and Signal Wiring Facilities
- CHAPTER 4 Air Conditioning
- Air conditioning conditions and capacities
- Direct blowing
- Underfloor ventilation
- Combined use of direct or duct blowing and underfloor ventilation
- Air Conditioning Conditions
- Recommended temperatures and humidities for computer rooms
- Temperature and humidity recommendations for computer rooms
- Figure 4.5 Psychrometric chart applicable to changing the room temperature
- Figure 4.6 Psychrometric chart applicable to lowering the underfloor temperature
- corrosive gases
- Seawater (salt damage)
- Thermal Load and Cooling Capacities
- Example of cooling capacity calculations for room air conditioning
- Underfloor ventilation air conditioning
- Convenient formulas for air conditioning capacities
- Precautions Pertaining to the Installation of Air Conditioners
- Air conditioner filters
- Installing temperature/humidity sensors
- Preventing dew condensation in underfloor ventilation
- Preventing water leaks and installing detectors
- Installing a backup unit
- magnetic fields
- CHAPTER 5 Electromagnetic Environment and Static Electricity
- Magnetic field control
- electric fields
- Static Electricity
- CHAPTER 6 Power Supply Facilities
- Calculating the power required
- Power Supply Facilities
- Selecting power supply facilities
- UPS Requirements
- Figure 6.3 Commutating load circuit
- Grounding
- Grounding equipment in the computer room
- Grounding other equipment
- Grounding LAN devices
- Grounding-plate method
- Figure 6.6 Grounding-plate method
- Distribution Panels
- Distribution panel structure
- Figure 6.9 Round crimp terminal dimensions
- Distribution Lines
- Share of Responsibility for Construction in a Computer Room
- Distribution Line Insulation Testing
- CHAPTER 7 Protection Against Lightning
- Protection of AC Line
- Figure 7.1 Surge absorber (power outlet connected type)
- Protection of Signal Lines
- basic concepts
- Objects of security
- Kinds of disasters
- Figure 8.1 Designating alarm zones
- Earthquakes
- Water damage
- Burglary
- Rat damage
- Maintenance and Management of Disaster Control Facilities
- Appendix A Conversion Information
- A.2 Fraction to Decimal Equivalence
- Acronyms & Abbreviations
- Index
M10 Series
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- how to use this document
- related documentation
- disposal and recycling
- documentation feedback
- software requirements
- Notes on using Oracle Solaris
- dynamic reconfiguration of physical
- dynamic reconfiguration of PCIe endpoint
- Software supporting Software on
- web browser
- Direct I/O Function for the PCI Expansion
- Latest Information on XCP
- Notes on Secure Socket Layer (SSL) 3
- Notes and restrictions on the SR-IOV functions
- Notes on OpenBoot PROM
- Notes on maintenance for CPU memory units, motherboard unit, XSCF unit, PSU backplane, or crossbar backplane unit
- Notes on CPU Activation
- Notes and restrictions on XSCF Web
- Notes on firmware update
- Notes on configurations with a PCI expansion unit connected
- notes on active directory
- Notes on the logical domain time
- Notes on Timezones
- Other notes and restrictions
- Restrictions on adding expansion rack
- Problems resolved in XCP
- Notes and Restrictions
- Notes on Oracle VM Server for SPARC
- Notes on live migration of Oracle VM Server for SPARC
- Notes on a case when recovery mode of Oracle VM Server for SPARC is enabled
- Notes on a case where openssl is used
- Notes on remote maintenance service
- Notes on SNMP
- Problems with XCP and Workarounds
- Problems resolved in versions prior to XCP
- Problems with Oracle Solaris and
- Notes and
- Problems with Hardware and
- Restrictions on replacing crossbar
- expansion unit
- Problems with PCI Expansion Units and