Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Overview of this manual
  5. HAC052852
  6. Product documentation
  7. How to read the product manual
  8. Safety
  9. Protective stop and emergency stop
  10. Safety actions
  11. Emergency release of the robot axes
  12. Make sure that the main power has been switched off
  13. Safety risks
  14. Moving robots are potentially lethal
  15. First test run may cause injury or damage
  16. Work inside the working range of the robot
  17. Enabling device and hold-to-run functionality
  18. Risks associated with live electric parts
  19. The unit is sensitive to ESD
  20. Hot parts may cause burns
  21. Safety risks related to pneumatic/hydraulic systems
  22. Brake testing
  23. Safety risks during handling of batteries
  24. Safety risks during work with gearbox lubricants (oil or grease)
  25. Safety signals and symbols
  26. Safety symbols on product labels
  27. Installation and commissioning
  28. Unpacking
  29. Working range
  30. Risk of tipping/stability
  31. Main dimensions
  32. On-site installation
  33. Attaching the robot and removing the fork lift accessory set
  34. Lifting the base plate
  35. Securing the base plate
  36. Lifting the robot with roundslings
  37. Returning of the ABB pallet
  38. Manually releasing the brakes
  39. Orienting and securing the robot
  40. Loads fitted to the robot, stopping time and braking distances
  41. Fitting equipment
  42. Restricting the working range
  43. Mechanically restricting the working range of axis 1
  44. electrical connections
  45. Installation of options
  46. Installing the motor cooling fans
  47. Start of robot in cold environments
  48. Maintenance
  49. Maintenance schedule and expected component life
  50. Maintenance schedule
  51. Expected component life
  52. Inspection activities
  53. Product manual - IRB
  54. Inspecting the oil level in axis-2 and 3 gearboxes
  55. Inspecting the oil level in axis-4 primary gearbox
  56. Inspecting the oil level in axis-4 secondary gearbox
  57. Inspecting the oil level in axis-5 gearbox
  58. Inspecting the oil level in axis-6 gearbox
  59. Inspecting the transparent plugs
  60. Inspecting the balancing devices
  61. Inspecting the cable harness
  62. Inspecting the information labels
  63. Inspecting the axis-1 mechanical stop pin
  64. Inspecting the additional mechanical stops
  65. Inspecting the fork lift accessories
  66. Inspecting the signal lamp (option)
  67. Inspecting dampers
  68. Replacement/changing activities
  69. Changing oil, axis-1 gearbox
  70. Changing oil in axis-2 and axis-3 gearbox
  71. Changing oil, axis-4 primary gearbox
  72. Changing oil, axis-4 secondary gearbox
  73. Changing oil, axis-5 gearbox
  74. Changing oil, axis-6 gearbox
  75. Replacing the SMB battery
  76. Lubrication activities
  77. Lubricating the cross roller bearing
  78. Cleaning activities
  79. Repair
  80. General procedures
  81. Mounting instructions for bearings
  82. Mounting instructions for seals
  83. Cut the paint or surface on the robot before replacing parts
  84. The brake release buttons may be jammed after service work
  85. Attaching lifting accessories
  86. Attaching lifting accessories to the wrist
  87. Cable harness
  88. Refitting the cable harness
  89. Replacing the SMB
  90. Replacing the brake release unit
  91. Upper and lower arms
  92. Replacing the wrist
  93. Replacing the axis-6 unit
  94. Replacing the turning disc
  95. Replacing the process turning disc
  96. Replacing the complete lower arm
  97. Replacing the parallel arm
  98. Frame and base
  99. Replacing the mechanical stop pin
  100. Replacing the parallel rod
  101. Unloading and restoring the balancing device
  102. Replacing the balancing devices
  103. Motors
  104. Replacing the axis-2 and axis-3 motors
  105. Replacing the axis-4 motor
  106. Replacing the axis-5 motor
  107. Replacing the axis-6 motor
  108. Gearboxes
  109. Replacing the axis-1 gearbox
  110. Replacing the axis-2 gearbox
  111. Replacing the axis-3 gearbox
  112. Replacing the axis-4 primary gearbox
  113. Replacing the axis-6 gearbox
  114. Calibration
  115. Calibration methods
  116. When to calibrate
  117. Synchronization marks and axis movement directions
  118. Calibration movement directions for all axes
  119. Updating revolution counters
  120. Calibrating with Axis Calibration method
  121. Calibration tools for Axis Calibration
  122. Installation locations for the calibration tools
  123. Axis Calibration - Running the calibration procedure
  124. Verifying the calibration
  125. Checking the synchronization position
  126. Decommissioning
  127. Scrapping of robot
  128. Decommissioning of balancing device
  129. Reference information
  130. Applicable standards
  131. Unit conversion
  132. Screw joints
  133. Weight specifications
  134. Standard toolkit
  135. Special tools
  136. Lifting accessories and lifting instructions
  137. Spare parts
  138. Circuit diagrams
  139. Index