Cadet C(C,D)(N)120 manuals
C(C,D)(N)120
Table of contents
- Table Of Contents
- PLEASE READ BEFORE PROCEEDING
- THE CADET HEATING BOILER -- HOW IT WORKS
- RATINGS
- determine boiler location
- Provide Air Openings to Room
- Corrosive Contaminants and Sources
- Removing a Boiler from Existing Common Vent
- PREPARE BOILER Gas Conversions
- Mounting the Boiler
- GENERAL VENTING Direct Venting Options
- Install Vent and Combustion Air Piping
- Sizing
- Materials
- Optional Room Air
- PVC/CPVC
- Polypropylene
- Stainless Steel Vent
- Vent/Air Termination - Sidewall
- sidewall direct venting
- Multiple Vent/Air Terminations
- Sidewall Termination - Optional Concentric Vent
- Vent/Air Termination - Vertical
- Vertical Termination - Optional Concentric Vent
- Alternate Vertical Concentric Venting
- vertical direct venting
- Low Water Cutoff Device
- Near Boiler Piping Components
- Near Boiler Piping Connections
- hydronic piping
- GAS CONNECTIONS Connecting Gas Supply Piping
- Natural Gas
- Check Inlet Gas Supply
- Gas Pressure
- Low Voltage Connections
- field wiring
- boiler control
- CONDENSATE DISPOSAL Condensate Drain
- STARTUP
- check for gas leaks
- start the boiler
- General
- operating information
- user programming sequence
- Viewable and Changeable Control Parameters
- access modes
- Cadet Heating Boiler Control Module
- Maintenance and Annual Startup
- address reported problems
- check expansion tank
- removal of combustion chamber lining
- cleaning boiler heat exchanger
- TROUBLESHOOTING
- corrective action
- COMBI
- specifications
- water piping
- Wiring Diagram (Standard)
- Ladder Diagram (Combi)
- Wiring Diagram (Combi)