Toshiba 1.5kV - 720A manuals
1.5kV - 720A
Table of contents
- SAFETY
- Table Of Contents
- Table Of Contents
- INTRODUCTION
- GENERAL DESCRIPTION
- Indicators and Controls
- RECEIVING, INSPECTION AND HANDLING
- INSTALLATION
- Ground Connections
- PRE-ENERGIZATION CHECK
- OPERATION
- Internal Connection of the Normally Energized Type
- Standard Operation Circuit of the Normally Energized Type
- MAINTENANCE
- Inspection and Maintenance Types
- Table 2 – Check Points for Periodic Inspection
- Table 3 – Gap/Wipe Standard Values (contactor in new condition)
- Vacuum Check
- Application of Test Voltage for Vacuum Check
- Electrical Service Life
- Storage
- SPECIFICATIONS
- WARRANTY AND LIMITATION OF LIABILITY