After OperationAO-15/10-12 6 x 15 mL or 12 x 10 mL / Max. 4k30 cm30 cm30 cmFixed-angle Rotors140VA220V 50/60HzHI-QG-T04(Rev.0)Quick Guide T04Cat. No. : T04HI-QG-T04(E)(Rev.0)Order & Inquiry l +82-2-3472-0727 l info@ihanil.com l www.ihanil.comService l +82-2-3452-8966 l techsupport@ihanil.comBefore OperationCheck the rotor is firmly tightened ontothe motor shaft.Check the Rotor LockingAfter relocating the device or loading the rotor,balance them by using a leveler. If necessary,level the device by adjusting the‘Levelingfoot’on the bottom of the device.Balancing the Centrifuge and RotorCautions For UseCheck the rotor, buckets and tubes arefree of scratch and crack before operation.Check the Accessories for AbnormalitiesLoad tubes symmetrically into therotor with identical amount.Load Tubes SymmetricallyRotorElectrical SafetySwitch off the device afteruse. Unplug the power plugbefore cleaning or unused fora long period of time.Check the wall outletis earth grounded,surge-protected andcansupply enough power.Switch Off the DeviceGrounded OutletCheck the Line VoltageMaintenanceConnect the device to voltagesources which correspond tothe electrical requirements onthe label attached to the device.If the device door cannot be opened, you can activatethe emergency open manually. 1. Wait for rotor to stopbefore activating the emergency open. 2. Insert the pininto the emergency open hole and push it until the dooris opened.Emergency Lid OpenKeep a safety clearance of 30 cm around thecentrifuge during operation.Keep a Safety ClearanceWipe up the moisture in the chamberwith a dry cloth after use. Keep the lidopen when not in use.Clean the chamber and rotor by wipingwith a cloth soaked in mild detergent anddry completely.Keep the Chamber DryCleaning